Citation: Sf. Bailey et al., Structural safety assessment of the Dorenaz bridge, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 1-12
Citation: Fy. Cheng et Ahs. Ang, Cost-effectiveness optimization for aseismic design criteria of RC buildings, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 13-25
Citation: Pc. Das, Prioritisation of bridge maintenance needs, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 26-44
Citation: Br. Ellingwood et Dj. Naus, Condition assessment and maintenance of aging structures in critical facilities - A probabilistic approach, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 45-56
Citation: L. Esteva et al., Life-cycle optimization of structures with seismic energy-dissipating devices, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 57-72
Authors:
Frangopol, DM
Enright, MP
Gharaibeh, E
Estes, AC
Citation: Dm. Frangopol et al., Towards optimal reliability-based bridge maintenance planning, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 73-88
Authors:
Furuta, H
Kamei, M
Kaneyoshi, M
Tanaka, H
Citation: H. Furuta et al., System identification for cable tension adjustment using fuzzy mathematical programming, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 89-101
Citation: M. Gasser et Gi. Schueller, On optimizing maintenance schedules by reliability based optimization, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 102-116
Citation: K. Imai et Dm. Frangopol, Finite element reliability-based assessment of an existing suspension bridge using geometrically nonlinear analysis, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 117-135
Citation: Y. Itoh et Cl. Liu, Multiobjective optimization of bridge deck maintenance, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 136-151
Citation: J. Kanda et I. Satoh, Optimum seismic load considering multi-damage criteria, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 152-163
Citation: U. Kirsch et F. Moses, Effective reanalysis for damaged structures, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 164-178
Citation: Fy. Kocer et Js. Arora, Optimal design of transmission line structures for earthquake loads, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 179-190
Citation: A. Lenzen et D. Hartmann, Optimization and reliability - Lifetime oriented design, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 191-201
Citation: Sk. Ng et F. Moses, Optimal policy for civil infrastructure systems using semi-Markov decisionprocess, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 202-215
Citation: R. Sexsmith, Retrofit planning for seismic upgrade of bridges, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 216-223
Citation: Jd. Sorensen et S. Engelund, Reliability-based optimal planning of maintenance of concrete structures, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 224-235
Citation: P. Thoft-christensen, Inspection-based evaluation of a Danish road bridge, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 236-247
Citation: L. Xu et De. Grierson, Case study of the optimal design of a structural steel framework, CASE STUDIES IN OPTIMAL DESIGN AND MAINTENANCE PLANNING OF CIVIL INFRASTRUCTURE SYSTEMS, 1999, pp. 248-257