AAAAAA

   
Results: 1-25 | 26-50 | 51-75 | 76-100 | >>
Results: 1-25/121

Authors: Grieco, A Semeraro, Q Tolio, T
Citation: A. Grieco et al., A review of different approaches to the FMS loading problem, INT J FLEX, 13(4), 2001, pp. 361-384

Authors: Lawley, M Reveliotis, S
Citation: M. Lawley et S. Reveliotis, Deadlock avoidance for sequential resource allocation systems: Hard and easy cases, INT J FLEX, 13(4), 2001, pp. 385-404

Authors: Matsui, M Uehara, S Ma, JS
Citation: M. Matsui et al., Performance evaluation of flexible manufacturing systems with finite localbuffers: Fixed and dynamic routings, INT J FLEX, 13(4), 2001, pp. 405-424

Authors: Anderson, SW
Citation: Sw. Anderson, Direct and indirect effects of product mix characteristics on capacity management decisions and operating performance, INT J FLEX, 13(3), 2001, pp. 241-265

Authors: Simeu-Abazi, Z Sassine, C
Citation: Z. Simeu-abazi et C. Sassine, Maintenance integration in manufacturing systems: From the modeling tool to evaluation, INT J FLEX, 13(3), 2001, pp. 267-285

Authors: Jang, JJ Suh, JD Park, N Liu, R
Citation: Jj. Jang et al., A look-ahead routing procedure for machine selection in a highly informative manufacturing system, INT J FLEX, 13(3), 2001, pp. 287-308

Authors: De Almeida, D Kellert, P
Citation: D. De Almeida et P. Kellert, A workload data aggregation process for flexible manufacturing system modeling using queueing network models, INT J FLEX, 13(3), 2001, pp. 309-350

Authors: Irani, Z Hlupic, V Giaglis, G
Citation: Z. Irani et al., Editorial: Business process reengineering: A modeling perspective, INT J FLEX, 13(2), 2001, pp. 99-104

Authors: Remenyi, D Sherwood-Smith, M
Citation: D. Remenyi et M. Sherwood-smith, Outcomes and benefit modeling for information systems investment, INT J FLEX, 13(2), 2001, pp. 105-129

Authors: Chan, FTS Jiang, B
Citation: Fts. Chan et B. Jiang, The applications of flexible manufacturing technologies in business process reengineering, INT J FLEX, 13(2), 2001, pp. 131-144

Authors: Presley, A Sarkis, J Barnett, W Liles, D
Citation: A. Presley et al., Engineering the virtual enterprise: An architecture-driven modeling approach, INT J FLEX, 13(2), 2001, pp. 145-162

Authors: Eldabi, T Paul, RJ
Citation: T. Eldabi et Rj. Paul, Evaluation of tools for modeling manufacturing systems design with multiple levels of detail, INT J FLEX, 13(2), 2001, pp. 163-176

Authors: Tucker, D Leonard, R
Citation: D. Tucker et R. Leonard, An innovative approach for using the GRAI methodology for reengineering the new product introduction process, INT J FLEX, 13(2), 2001, pp. 177-193

Authors: Whitman, L Huff, B
Citation: L. Whitman et B. Huff, On the use of enterprise models, INT J FLEX, 13(2), 2001, pp. 195-208

Authors: Giaglis, GM
Citation: Gm. Giaglis, A taxonomy of business process modeling and information systems modeling techniques, INT J FLEX, 13(2), 2001, pp. 209-228

Authors: Kim, S Park, J Leachman, RC
Citation: S. Kim et al., A supervisory control approach for execution control of an FMC, INT J FLEX, 13(1), 2001, pp. 5-31

Authors: Asef-Vaziri, A Dessouky, M Sriskandarajah, C
Citation: A. Asef-vaziri et al., A loop material flow system design for automated guided vehicles, INT J FLEX, 13(1), 2001, pp. 33-48

Authors: Shin, J Cho, H
Citation: J. Shin et H. Cho, Planning and sequencing heuristics for feature-based control of holonic machining equipment, INT J FLEX, 13(1), 2001, pp. 49-70

Authors: Zhao, CW Wu, ZM
Citation: Cw. Zhao et Zm. Wu, A genetic algorithm approach to the scheduling of FMSs with multiple routes, INT J FLEX, 13(1), 2001, pp. 71-88

Authors: Irani, Z Hlupic, V Giaglis, G
Citation: Z. Irani et al., Business-process reengineering: A design perspective, INT J FLEX, 12(4), 2000, pp. 247-252

Authors: Al-Mashari, M Zairi, M
Citation: M. Al-mashari et M. Zairi, Creating a fit between BPR and IT infrastructure: A proposed framework foreffective implementation, INT J FLEX, 12(4), 2000, pp. 253-274

Authors: Kim, HW
Citation: Hw. Kim, Business process versus coordination process in organizational change, INT J FLEX, 12(4), 2000, pp. 275-290

Authors: Talluri, S
Citation: S. Talluri, A benchmarking method for business-process reengineering and improvement, INT J FLEX, 12(4), 2000, pp. 291-304

Authors: Clarke, S Elliman, T Lehaney, B
Citation: S. Clarke et al., Reengineering an information system: A case study in risk reduction, INT J FLEX, 12(4), 2000, pp. 305-320

Authors: Nissen, ME
Citation: Me. Nissen, An intelligent tool for process redesign: Manufacturing supply-chain applications, INT J FLEX, 12(4), 2000, pp. 321-339
Risultati: 1-25 | 26-50 | 51-75 | 76-100 | >>