AAAAAA

   
Results: 1-7 |
Results: 7

Authors: ADAMOPOULOS GI PAPPIS CP
Citation: Gi. Adamopoulos et Cp. Pappis, SCHEDULING UNDER A COMMON DUE-DATE ON PARALLEL UNRELATED MACHINES, European journal of operational research, 105(3), 1998, pp. 494-501

Authors: ADAMOPOULOS GI PAPPIS CP
Citation: Gi. Adamopoulos et Cp. Pappis, A FUZZY-LINGUISTIC APPROACH TO A MULTICRITERIA SEQUENCING PROBLEM, European journal of operational research, 92(3), 1996, pp. 628-636

Authors: ADAMOPOULOS GI PAPPIS CP
Citation: Gi. Adamopoulos et Cp. Pappis, SCHEDULING JOBS WITH DIFFERENT, JOB-DEPENDENT EARLINESS AND TARDINESSPENALTIES USING THE SLK METHOD, European journal of operational research, 88(2), 1996, pp. 336-344

Authors: ADAMOPOULOS GI PAPPIS CP
Citation: Gi. Adamopoulos et Cp. Pappis, SINGLE-MACHINE SCHEDULING WITH FLOW ALLOWANCES, The Journal of the Operational Research Society, 47(10), 1996, pp. 1280-1285

Authors: ADAMOPOULOS GI PAPPIS CP
Citation: Gi. Adamopoulos et Cp. Pappis, THE CON DUE-DATE DETERMINATION METHOD WITH PROCESSING TIME-DEPENDENT LATENESS PENALTIES, International journal of production economics, 40(1), 1995, pp. 29-36

Authors: ADAMOPOULOS GI PAPPIS CP
Citation: Gi. Adamopoulos et Cp. Pappis, AN ALGORITHMIC APPROACH TO SOME SPECIAL CASES OF THE GENERALIZED INVERSE PROBLEM, Fuzzy sets and systems, 72(1), 1995, pp. 125-127

Authors: ADAMOPOULOS GI PAPPIS CP
Citation: Gi. Adamopoulos et Cp. Pappis, SOME RESULTS ON THE RESOLUTION OF FUZZY RELATION EQUATIONS, Fuzzy sets and systems, 60(1), 1993, pp. 83-88
Risultati: 1-7 |