AAAAAA

   
Results: 1-14 |
Results: 14

Authors: ASKIN RG ZHOU M
Citation: Rg. Askin et M. Zhou, FORMATION OF INDEPENDENT FLOW-LINE CELLS BASED ON OPERATION REQUIREMENTS AND MACHINE CAPABILITIES, IIE transactions, 30(4), 1998, pp. 319-329

Authors: SELIM HM ASKIN RG VAKHARIA AJ
Citation: Hm. Selim et al., CELL-FORMATION IN GROUP TECHNOLOGY - REVIEW, EVALUATION AND DIRECTIONS FOR FUTURE-RESEARCH, Computers & industrial engineering, 34(1), 1998, pp. 3-20

Authors: ZHOU M ASKIN RG
Citation: M. Zhou et Rg. Askin, FORMATION OF GENERAL GT CELLS - AN OPERATION-BASED APPROACH, Computers & industrial engineering, 34(1), 1998, pp. 147-157

Authors: IYER A ASKIN RG
Citation: A. Iyer et Rg. Askin, A GENERAL FRAMEWORK FOR COMPARING OPERATING POLICIES IN MANUFACTURINGCELLS, Annals of operations research, 77, 1998, pp. 23-50

Authors: ASKIN RG SELIM HM VAKHARIA AJ
Citation: Rg. Askin et al., A METHODOLOGY FOR DESIGNING FLEXIBLE CELLULAR MANUFACTURING SYSTEMS, IIE transactions, 29(7), 1997, pp. 599-610

Authors: ASKIN RG
Citation: Rg. Askin, DESIGN AND MANUFACTURING ON AGILE MANUFACTURING, IIE transactions, 29(10), 1997, pp. 3-3

Authors: ASKIN RG ZHOU M
Citation: Rg. Askin et M. Zhou, A PARALLEL STATION HEURISTIC FOR THE MIXED-MODEL PRODUCTION LINE BALANCING PROBLEM, International Journal of Production Research, 35(11), 1997, pp. 3095-3105

Authors: DEMMEL JG ASKIN RG
Citation: Jg. Demmel et Rg. Askin, MULTIOBJECTIVE EVALUATION OF ADVANCED MANUFACTURING SYSTEM TECHNOLOGYINVESTMENTS WITH RISK, IIE transactions, 28(3), 1996, pp. 249-259

Authors: ASKIN RG DROR M VAKHARIA AJ
Citation: Rg. Askin et al., PRINTED-CIRCUIT BOARD FAMILY GROUPING AND COMPONENT ALLOCATION FOR A MULTIMACHINE, OPEN-SHOP ASSEMBLY CELL, Naval research logistics, 41(5), 1994, pp. 587-608

Authors: SODHI MS ASKIN RG SEN S
Citation: Ms. Sodhi et al., A HIERARCHICAL MODEL FOR CONTROL OF FLEXIBLE MANUFACTURING SYSTEMS, The Journal of the Operational Research Society, 45(10), 1994, pp. 1185-1196

Authors: ASKIN RG KRISHT AH
Citation: Rg. Askin et Ah. Krisht, OPTIMAL OPERATION OF MANUFACTURING SYSTEMS WITH CONTROLLED WORK-IN-PROCESS LEVELS, International Journal of Production Research, 32(7), 1994, pp. 1637-1653

Authors: SODHI MS ASKIN RG SEN S
Citation: Ms. Sodhi et al., MULTIPERIOD TOOL AND PRODUCTION ASSIGNMENT IN FLEXIBLE MANUFACTURING SYSTEMS, International Journal of Production Research, 32(6), 1994, pp. 1281-1294

Authors: MITWASI MG ASKIN RG
Citation: Mg. Mitwasi et Rg. Askin, PRODUCTION PLANNING FOR A MULTIITEM, SINGLE-STAGE KANBAN SYSTEM, International Journal of Production Research, 32(5), 1994, pp. 1173-1195

Authors: ASKIN RG IYER A
Citation: Rg. Askin et A. Iyer, A COMPARISON OF SCHEDULING PHILOSOPHIES FOR MANUFACTURING CELLS, European journal of operational research, 69(3), 1993, pp. 438-449
Risultati: 1-14 |