AAAAAA

   
Results: 1-6 |
Results: 6

Authors: Anders, GJ Endrenyi, J Yung, C
Citation: Gj. Anders et al., Risk-based planner for asset management, IEEE COM AP, 14(4), 2001, pp. 20-26

Authors: Endrenyi, J Aboresheid, S Allan, RN Anders, GJ Asgarpoor, S Billinton, R Chowdhury, N Dialynas, EN Fipper, M Fletcher, RH Grigg, C McCalley, J Meliopoulos, S Mielnik, TC Nitu, P Rau, N Reppen, ND Salvaderi, L Schneider, A Singh, C
Citation: J. Endrenyi et al., The present status of maintenance strategies and the impact of maintenanceon reliability, IEEE POW SY, 16(4), 2001, pp. 638-646

Authors: Anders, GJ da Silva, AML
Citation: Gj. Anders et Aml. Da Silva, Cost related reliability measures for power system equipment, IEEE POW SY, 15(2), 2000, pp. 654-660

Authors: Anders, GJ Napieralski, A Kulesza, Z
Citation: Gj. Anders et al., Calculation of the internal thermal resistance and ampacity of 3-core screened cables with fillers, IEEE POW D, 14(3), 1999, pp. 729-734

Authors: da Silva, AML Lima, JWM Anders, GJ
Citation: Aml. Da Silva et al., Available transmission capability - Sell firm or interruptible?, IEEE POW SY, 14(4), 1999, pp. 1299-1305

Authors: Anders, GJ Coates, DW Thompson, K Innis, JL
Citation: Gj. Anders et al., Observations of active-chromosphere stars - V. A photometric study of the RS CVn system CF Tuc (HD 5303), M NOT R AST, 310(2), 1999, pp. 377-386
Risultati: 1-6 |