Citation: M. Elhafsi et Sx. Bai, MULTIPERIOD PRODUCTION PLANNING WITH DEMAND AND COST FLUCTUATION, Mathematical and computer modelling, 28(3), 1998, pp. 103-119
Citation: M. Wiktorsson et al., AN OPTIMAL PRODUCTION FLOW-CONTROL PROBLEM WITH IMPULSIVE DEMAND, Mathematical and computer modelling, 26(2), 1997, pp. 53-67
Citation: Sx. Bai et M. Elhafsi, SCHEDULING OF AN UNRELIABLE MANUFACTURING SYSTEM WITH NONRESUMABLE SETUPS, Computers & industrial engineering, 32(4), 1997, pp. 909-925
Citation: Sg. Yue et al., FLEXIBLE ROTOR BEAM ELEMENT FOR THE MANIPULATORS WITH JOINT AND LINK FLEXIBILITY, Mechanism and machine theory, 32(2), 1997, pp. 209-219
Citation: Sx. Bai, A NOTE ON DETERMINING PURE-STRATEGY EQUILIBRIUM POINTS OF BIMATRIX GAMES, Computers & mathematics with applications, 32(7), 1996, pp. 29-35
Citation: Sx. Bai et S. Varanasi, AN OPTIMAL PRODUCTION FLOW-CONTROL PROBLEM WITH PIECEWISE-CONSTANT DEMAND, Mathematical and computer modelling, 24(7), 1996, pp. 87-107
Citation: M. Elhafsi et Sx. Bai, OPTIMAL PRODUCTION AND SETUP CONTROL OF A DYNAMIC 2-PRODUCT MANUFACTURING SYSTEM - ANALYTICAL SOLUTION, Mathematical and computer modelling, 24(3), 1996, pp. 57-78
Citation: Fj. Kramer et Sx. Bai, OPTIMAL-CONTROL OF A PRODUCTION SYSTEM WITH PERIODIC MAINTENANCE, Optimal control applications & methods, 17(4), 1996, pp. 281-307
Citation: Sx. Bai et Sb. Gershwin, SCHEDULING MANUFACTURING SYSTEMS WITH WORK-IN-PROCESS INVENTORY CONTROL - SINGLE-PART-TYPE SYSTEMS, IIE transactions, 27(5), 1995, pp. 599-617
Citation: Sx. Bai et Sb. Gershwin, SCHEDULING MANUFACTURING SYSTEMS WITH WORK-IN-PROCESS INVENTORY CONTROL - MULTIPLE-PART-TYPE SYSTEMS, International Journal of Production Research, 32(2), 1994, pp. 365-385