Citation: P. Baptiste et C. Jacquemard, Exact distribution of the makespan in a two machines flow shop with two kinds of jobs, INT J PRO E, 74(1-3), 2001, pp. 77-83
Citation: C. Le Pape et P. Baptiste, Heuristic control of a constraint-based algorithm for the preemptive job-shop scheduling problem, J HEURISTIC, 5(3), 1999, pp. 305-325
Citation: P. Baptiste, An O(n(4)) algorithm for preemptive scheduling of a single machine to minimize the number of late jobs, OPER RES L, 24(4), 1999, pp. 175-180