AAAAAA

   
Results: 1-11 |
Results: 11

Authors: Baptiste, P Jacquemard, C
Citation: P. Baptiste et C. Jacquemard, Exact distribution of the makespan in a two machines flow shop with two kinds of jobs, INT J PRO E, 74(1-3), 2001, pp. 77-83

Authors: Baptiste, P Jouglet, A
Citation: P. Baptiste et A. Jouglet, On minimizing total tardiness in a serial batching problem, RAIRO RE OP, 35(1), 2001, pp. 107-115

Authors: Neron, E Baptiste, P Gupta, JND
Citation: E. Neron et al., Solving hybrid flow shop problem using energetic reasoning and global operations, OMEGA-INT J, 29(6), 2001, pp. 501-511

Authors: Baptiste, P
Citation: P. Baptiste, 3 restored Vietnamese sculptures, REV LOUVRE, (1), 2001, pp. 58-67

Authors: Baptiste, P
Citation: P. Baptiste, Scheduling equal-length jobs on identical parallel machines, DISCR APP M, 103(1-3), 2000, pp. 21-32

Authors: Baptiste, P
Citation: P. Baptiste, Batching identical jobs, MATH M O R, 52(3), 2000, pp. 355-367

Authors: Manier, MA Varnier, C Baptiste, P
Citation: Ma. Manier et al., Constraint-based model for the cyclic multi-hoists scheduling problem, PROD PLAN C, 11(3), 2000, pp. 244-257

Authors: Le Pape, C Baptiste, P
Citation: C. Le Pape et P. Baptiste, Heuristic control of a constraint-based algorithm for the preemptive job-shop scheduling problem, J HEURISTIC, 5(3), 1999, pp. 305-325

Authors: Bahroun, Z Baptiste, P Campagne, JP Moalla, M
Citation: Z. Bahroun et al., Production planning and scheduling in the context of cyclic delivery schedules, COM IND ENG, 37(1-2), 1999, pp. 3-7

Authors: Baptiste, P Le Pape, C Nuijten, W
Citation: P. Baptiste et al., Satisfiability tests and time-bound adjustments for cumulative scheduling problems, ANN OPER R, 92, 1999, pp. 305-333

Authors: Baptiste, P
Citation: P. Baptiste, An O(n(4)) algorithm for preemptive scheduling of a single machine to minimize the number of late jobs, OPER RES L, 24(4), 1999, pp. 175-180
Risultati: 1-11 |