AAAAAA

   
Results: 1-10 |
Results: 10

Authors: Thengvall, BG Yu, G Bard, JF
Citation: Bg. Thengvall et al., Multiple fleet aircraft schedule recovery following hub closures, TRANSP R A, 35(4), 2001, pp. 289-308

Authors: Bard, JF Yu, G Arguello, MF
Citation: Jf. Bard et al., Optimizing aircraft routings in response to groundings and delays, IIE TRANS, 33(10), 2001, pp. 931-947

Authors: Dempe, S Bard, JF
Citation: S. Dempe et Jf. Bard, Bundle trust-region algorithm for bilinear bilevel programming, J OPTIM TH, 110(2), 2001, pp. 265-288

Authors: Thengvall, BG Bard, JF Yu, G
Citation: Bg. Thengvall et al., Balancing user preferences for aircraft schedule recovery during irregularoperations, IIE TRANS, 32(3), 2000, pp. 181-193

Authors: Bard, JF
Citation: Jf. Bard, Introduction to linear optimization, INTERFACES, 30(4), 2000, pp. 96-98

Authors: Rios-Mercado, RZ Bard, JF
Citation: Rz. Rios-mercado et Jf. Bard, An enhanced TSP-based heuristic for makespan minimization in a flow shop with setup times, J HEURISTIC, 5(1), 1999, pp. 53-70

Authors: Rio-Mercado, RZ Bard, JF
Citation: Rz. Rio-mercado et Jf. Bard, A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times, IIE TRANS, 31(8), 1999, pp. 721-731

Authors: Bard, JF Srinivasan, K Tirupati, D
Citation: Jf. Bard et al., An optimization approach to capacity expansion in semiconductor manufacturing facilities, INT J PROD, 37(15), 1999, pp. 3359-3382

Authors: Bard, JF Huang, L Dror, M Jaillet, P
Citation: Jf. Bard et al., A branch and cut algorithm for the VRP with satellite facilities, IIE TRANS, 30(9), 1998, pp. 821-834

Authors: Bard, JF
Citation: Jf. Bard, Conceptual design and analysis of rail car unloading area, APPL OPTIM, 16, 1998, pp. 272-300
Risultati: 1-10 |