Authors:
SALOMON M
SOLOMON MM
VANWASSENHOVE LN
DUMAS Y
DAUZEREPERES S
Citation: M. Salomon et al., SOLVING THE DISCRETE LOTSIZING AND SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SET-UP COSTS AND SET-UP TIMES USING THE TRAVELING SALESMAN PROBLEM WITH TIME WINDOWS, European journal of operational research, 100(3), 1997, pp. 494-513
Authors:
ZWANEVELD PJ
KROON LG
ROMEIJN HE
SALOMON M
DAUZEREPERES S
VANHOESEL SPM
AMBERGEN HW
Citation: Pj. Zwaneveld et al., ROUTING TRAINS THROUGH RAILWAY STATIONS - MODEL FORMULATION AND ALGORITHMS, Transportation science, 30(3), 1996, pp. 181-194
Citation: S. Dauzereperes, A PROCEDURE FOR THE ONE-MACHINE SEQUENCING PROBLEM WITH DEPENDENT JOBS, European journal of operational research, 81(3), 1995, pp. 579-589
Citation: S. Dauzereperes, MINIMIZING LATE JOBS IN THE GENERAL ONE MACHINE SCHEDULING PROBLEM, European journal of operational research, 81(1), 1995, pp. 134-142
Citation: S. Dauzereperes et Jb. Lasserre, INTEGRATION OF LOTSIZING AND SCHEDULING DECISIONS IN A JOB-SHOP, European journal of operational research, 75(2), 1994, pp. 413-426
Citation: S. Dauzereperes et Jb. Lasserre, AN ITERATIVE PROCEDURE FOR LOT STREAMING IN JOB-SHOP SCHEDULING, Computers & industrial engineering, 25(1-4), 1993, pp. 231-234