AAAAAA

   
Results: 1-7 |
Results: 7

Authors: LEMAITRE P KOBLE TD DOCTOR SR
Citation: P. Lemaitre et al., SUMMARY OF THE PISC ROUND-ROBIN RESULTS ON WROUGHT AND CAST AUSTENITIC STEEL WELDMENTS .1. WROUGHT-TO-WROUGHT CAPABILITY STUDY, International journal of pressure vessels and piping, 69(1), 1996, pp. 5-19

Authors: LEMAITRE P KOBLE TD DOCTOR SR
Citation: P. Lemaitre et al., SUMMARY OF THE PISC ROUND-ROBIN RESULTS ON WROUGHT AND CAST AUSTENITIC STEEL WELDMENTS .2. WROUGHT-TO-CAST CAPABILITY STUDY, International journal of pressure vessels and piping, 69(1), 1996, pp. 21-32

Authors: LEMAITRE P KOBLE TD DOCTOR SR
Citation: P. Lemaitre et al., SUMMARY OF THE PISC ROUND-ROBIN RESULTS ON WROUGHT AND CAST AUSTENITIC STEEL WELDMENTS .3. CAST-TO-CAST CAPABILITY STUDY, International journal of pressure vessels and piping, 69(1), 1996, pp. 33-44

Authors: DOCTOR SR LEMAITRE P CRUTZEN S
Citation: Sr. Doctor et al., AUSTENITIC STEEL PIPING TESTING EXERCISES IN PISC, Nuclear Engineering and Design, 157(1-2), 1995, pp. 231-244

Authors: VO TV GORE BF SIMONEN FA DOCTOR SR
Citation: Tv. Vo et al., RISK ASSESSMENT IN SETTING INSERVICE INSPECTION PRIORITIES AT LIGHT-WATER REACTORS, Nuclear Engineering and Design, 142(2-3), 1993, pp. 239-253

Authors: VO TV SIMONEN FA DOCTOR SR SMITH BW GORE BF
Citation: Tv. Vo et al., DEVELOPMENT OF IN-SERVICE INSPECTION PLANS FOR NUCLEAR-COMPONENTS AT THE SURRY UNIT-1 NUCLEAR-POWER STATION, Nuclear technology, 102(3), 1993, pp. 403-415

Authors: DOCTOR SR CAVALIER TM EGBELU PJ
Citation: Sr. Doctor et al., SCHEDULING FOR MACHINING AND ASSEMBLY IN A JOB-SHOP ENVIRONMENT, International Journal of Production Research, 31(6), 1993, pp. 1275-1297
Risultati: 1-7 |