Citation: P. Lemaitre et al., SUMMARY OF THE PISC ROUND-ROBIN RESULTS ON WROUGHT AND CAST AUSTENITIC STEEL WELDMENTS .1. WROUGHT-TO-WROUGHT CAPABILITY STUDY, International journal of pressure vessels and piping, 69(1), 1996, pp. 5-19
Citation: P. Lemaitre et al., SUMMARY OF THE PISC ROUND-ROBIN RESULTS ON WROUGHT AND CAST AUSTENITIC STEEL WELDMENTS .2. WROUGHT-TO-CAST CAPABILITY STUDY, International journal of pressure vessels and piping, 69(1), 1996, pp. 21-32
Citation: P. Lemaitre et al., SUMMARY OF THE PISC ROUND-ROBIN RESULTS ON WROUGHT AND CAST AUSTENITIC STEEL WELDMENTS .3. CAST-TO-CAST CAPABILITY STUDY, International journal of pressure vessels and piping, 69(1), 1996, pp. 33-44
Citation: Tv. Vo et al., RISK ASSESSMENT IN SETTING INSERVICE INSPECTION PRIORITIES AT LIGHT-WATER REACTORS, Nuclear Engineering and Design, 142(2-3), 1993, pp. 239-253
Authors:
VO TV
SIMONEN FA
DOCTOR SR
SMITH BW
GORE BF
Citation: Tv. Vo et al., DEVELOPMENT OF IN-SERVICE INSPECTION PLANS FOR NUCLEAR-COMPONENTS AT THE SURRY UNIT-1 NUCLEAR-POWER STATION, Nuclear technology, 102(3), 1993, pp. 403-415
Citation: Sr. Doctor et al., SCHEDULING FOR MACHINING AND ASSEMBLY IN A JOB-SHOP ENVIRONMENT, International Journal of Production Research, 31(6), 1993, pp. 1275-1297