AAAAAA

   
Results: 1-8 |
Results: 8

Authors: Duenyas, I Tsai, CY
Citation: I. Duenyas et Cy. Tsai, Control of a manufacturing system with random product yield and downward substitutability, IIE TRANS, 32(9), 2000, pp. 785-795

Authors: Neale, JJ Duenyas, I
Citation: Jj. Neale et I. Duenyas, Control of manufacturing networks which contain a batch processing machine, IIE TRANS, 32(11), 2000, pp. 1027-1041

Authors: Iravani, SMR Duenyas, I Olsen, TL
Citation: Smr. Iravani et al., A production/inventory system subject to failure with limited repair capacity, OPERAT RES, 48(6), 2000, pp. 951-964

Authors: Carr, S Duenyas, I
Citation: S. Carr et I. Duenyas, Optimal admission control and sequencing in a make-to-stock/make-to-order production system, OPERAT RES, 48(5), 2000, pp. 709-720

Authors: Keblis, MF Duenyas, I
Citation: Mf. Keblis et I. Duenyas, Control of an assembly system with processing time and subassembly-type uncertainty, INT J FLEX, 11(4), 1999, pp. 353-370

Authors: Van Oyen, MP Duenyas, I Tsai, CY
Citation: Mp. Van Oyen et al., Stochastic sequencing with job families, set-up times, and due dates, INT J SYST, 30(2), 1999, pp. 175-181

Authors: Ahn, HS Duenyas, I Zhang, RQ
Citation: Hs. Ahn et al., Optimal stochastic scheduling of a two-stage tandem queue with parallel servers, ADV APPL P, 31(4), 1999, pp. 1095-1117

Authors: Birge, JR Drogosz, J Duenyas, I
Citation: Jr. Birge et al., Setting single-period optimal capacity levels and prices for substitutableproducts, INT J FLEX, 10(4), 1998, pp. 407-430
Risultati: 1-8 |