Authors:
LEVITIN G
LISNIANSKI A
BENHAIM H
ELMAKIS D
Citation: G. Levitin et al., REDUNDANCY OPTIMIZATION FOR SERIES-PARALLEL MULTI STATE SYSTEMS, IEEE transactions on reliability, 47(2), 1998, pp. 165-172
Citation: G. Levitin et al., STRUCTURE OPTIMIZATION OF POWER-SYSTEM WITH DIFFERENT REDUNDANT ELEMENTS, Electric power systems research, 43(1), 1997, pp. 19-27
Citation: R. Miroshnik et al., LIFE ASSESSMENT EVALUATION OF PIPING BRANCH CONNECTION UNDER CREEP AND FATIGUE, International journal of pressure vessels and piping, 71(2), 1997, pp. 147-154
Authors:
LISNIANSKI A
LEVITIN G
BENHAIM H
ELMAKIS D
Citation: A. Lisnianski et al., POWER-SYSTEM STRUCTURE OPTIMIZATION SUBJECT TO RELIABILITY CONSTRAINTS, Electric power systems research, 39(2), 1996, pp. 145-152
Citation: G. Levitin et al., RELIABILITY INDEXES OF A RADIAL-DISTRIBUTION SYSTEM WITH SECTIONALIZING AS A FUNCTION OF NETWORK STRUCTURE PARAMETERS, Electric power systems research, 36(2), 1996, pp. 73-80
Citation: G. Levitin et al., GENETIC ALGORITHM FOR OPTIMAL SECTIONALIZING IN RADIAL-DISTRIBUTION SYSTEMS WITH ALTERNATIVE SUPPLY, Electric power systems research, 35(3), 1995, pp. 149-155
Citation: G. Levitin et al., OPTICAL SECTIONALIZER ALLOCATION IN ELECTRIC DISTRIBUTION-SYSTEMS BY GENETIC ALGORITHM, Electric power systems research, 31(2), 1994, pp. 97-102