Citation: A. Federgruen et G. Mosheiov, HEURISTICS FOR MULTIMACHINE MINMAX SCHEDULING PROBLEMS WITH GENERAL EARLINESS AND TARDINESS COSTS, Naval research logistics, 44(3), 1997, pp. 287-299
Citation: Y. Aviv et A. Federgruen, STOCHASTIC INVENTORY MODELS WITH LIMITED PRODUCTION CAPACITY AND PERIODICALLY VARYING PARAMETERS, Probability in the engineering and informational sciences, 11(1), 1997, pp. 107-135
Citation: A. Federgruen et G. Vanryzin, PROBABILISTIC ANALYSIS OF A GENERALIZED BIN PACKING PROBLEM AND APPLICATIONS, Operations research, 45(4), 1997, pp. 596-609
Citation: A. Federgruen et G. Mosheiov, SINGLE-MACHINE SCHEDULING PROBLEMS WITH GENERAL BREAKDOWNS, EARLINESSAND TARDINESS COSTS, Operations research, 45(1), 1997, pp. 66-71
Citation: A. Federgruen et G. Vanryzin, PROBABILISTIC ANALYSIS OF A COMBINED AGGREGATION AND MATH PROGRAMMINGHEURISTIC FOR A GENERAL-CLASS OF VEHICLE-ROUTING AND SCHEDULING PROBLEMS, Management science, 43(8), 1997, pp. 1060-1078
Citation: A. Federgruen et G. Mosheiov, HEURISTICS FOR MULTIMACHINE SCHEDULING PROBLEMS WITH EARLINESS AND TARDINESS COSTS (VOL 42, PG 1544, 1996), Management science, 43(5), 1997, pp. 735-735
Citation: A. Federgruen et Z. Katalan, CUSTOMER WAITING-TIME DISTRIBUTIONS UNDER BASE-STOCK POLICIES IN SINGLE-FACILITY MULTIITEM PRODUCTION SYSTEMS, Naval research logistics, 43(4), 1996, pp. 533-548
Citation: A. Federgruen et M. Tzur, DETECTION OF MINIMAL FORECAST HORIZONS IN DYNAMIC PROGRAMS WITH MULTIPLE INDICATORS OF THE FUTURE, Naval research logistics, 43(2), 1996, pp. 169-189
Citation: A. Federgruen et Z. Katalan, THE IMPACT OF SETUP TIMES ON THE PERFORMANCE OF MULTICLASS SERVICE AND PRODUCTION SYSTEMS, Operations research, 44(6), 1996, pp. 989-1001
Citation: A. Federgruen et Z. Katalan, THE STOCHASTIC ECONOMIC LOT SCHEDULING PROBLEM - CYCLICAL BASE-STOCK POLICIES WITH IDLE TIMES, Management science, 42(6), 1996, pp. 783-796
Citation: A. Federgruen et G. Mosheiov, HEURISTICS FOR MULTIMACHINE SCHEDULING PROBLEMS WITH EARLINESS AND TARDINESS COSTS, Management science, 42(11), 1996, pp. 1544-1555
Citation: A. Federgruen et Ys. Zheng, EFFICIENT ALGORITHMS FOR FINDING OPTIMAL POWER-OF-2 POLICIES FOR PRODUCTION DISTRIBUTION SYSTEMS WITH GENERAL JOINT SETUP COSTS/, Operations research, 43(3), 1995, pp. 458-470
Citation: A. Federgruen et M. Tzur, FAST SOLUTION AND DETECTION OF MINIMAL FORECAST HORIZONS IN DYNAMIC PROGRAMS WITH A SINGLE INDICATOR OF THE FUTURE - APPLICATIONS TO DYNAMIC LOT-SIZING MODELS, Management science, 41(5), 1995, pp. 874-893
Citation: A. Federgruen et G. Mosheiov, GREEDY HEURISTICS FOR SINGLE-MACHINE SCHEDULING PROBLEMS WITH GENERALEARLINESS AND TARDINESS COSTS, Operations research letters, 16(4), 1994, pp. 199-208
Citation: A. Federgruen et M. Tzur, THE JOINT REPLENISHMENT PROBLEM WITH TIME-VARYING COSTS AND DEMANDS -EFFICIENT, ASYMPTOTIC AND EPSILON-OPTIMAL SOLUTIONS, Operations research, 42(6), 1994, pp. 1067-1086
Citation: A. Federgruen et M. Tzur, MINIMAL FORECAST HORIZONS AND A NEW PLANNING PROCEDURE FOR THE GENERAL DYNAMIC LOT-SIZING MODEL - NERVOUSNESS REVISITED, Operations research, 42(3), 1994, pp. 456-468
Citation: A. Federgruen et G. Mosheiov, SIMULTANEOUS-OPTIMIZATION OF EFFICIENCY AND PERFORMANCE BALANCE MEASURES IN SINGLE-MACHINE SCHEDULING PROBLEMS, Naval research logistics, 40(7), 1993, pp. 951-970
Citation: A. Federgruen et M. Tzur, THE DYNAMIC LOT-SIZING MODEL WITH BACKLOGGING - A SIMPLE O(N-LOG-N) ALGORITHM AND MINIMAL FORECAST HORIZON PROCEDURE, Naval research logistics, 40(4), 1993, pp. 459-478
Citation: A. Federgruen et Ys. Zheng, OPTIMAL POWER-OF-2 REPLENISHMENT STRATEGIES IN CAPACITATED GENERAL PRODUCTION DISTRIBUTION NETWORKS, Management science, 39(6), 1993, pp. 710-727