AAAAAA

   
Results: 1-3 |
Results: 3

Authors: FORTEMPS P
Citation: P. Fortemps, JOBSHOP SCHEDULING WITH IMPRECISE DURATIONS - A FUZZY APPROACH, IEEE transactions on fuzzy systems, 5(4), 1997, pp. 557-569

Authors: FORTEMPS P OST C PIRLOT M TEGHEM J TUYTTENS D
Citation: P. Fortemps et al., USING METAHEURISTICS FOR SOLVING A PRODUCTION SCHEDULING PROBLEM IN ACHEMICAL FIRM - A CASE-STUDY, International journal of production economics, 46, 1996, pp. 13-26

Authors: FORTEMPS P ROUBENS M
Citation: P. Fortemps et M. Roubens, RANKING AND DEFUZZIFICATION METHODS BASED ON AREA COMPENSATION, Fuzzy sets and systems, 82(3), 1996, pp. 319-330
Risultati: 1-3 |