AAAAAA

   
Results: 1-25 | 26-41
Results: 1-25/41

Authors: GUNASEKARAN A GOYAL SK MARTIKAINEN T YLIOLLI P
Citation: A. Gunasekaran et al., A CONCEPTUAL-FRAMEWORK FOR THE IMPLEMENTATION OF ZERO-INVENTORY AND JUST-IN-TIME MANUFACTURING CONCEPTS, Human factors and ergonomics in manufacturing, 8(1), 1998, pp. 63-78

Authors: RAO SS GUNASEKARAN A GOYAL SK MARTIKAINEN T
Citation: Ss. Rao et al., WAITING LINE MODEL APPLICATIONS IN MANUFACTURING, International journal of production economics, 54(1), 1998, pp. 1-28

Authors: GUNASEKARAN A GOYAL SK MARTIKAINEN T YLIOLLI P
Citation: A. Gunasekaran et al., PRODUCTION CAPACITY PLANNING AND CONTROL IN MULTISTAGE MANUFACTURING, The Journal of the Operational Research Society, 49(6), 1998, pp. 625-634

Authors: GOYAL SK SEYFRIED MS ONEILL PE
Citation: Sk. Goyal et al., EFFECT OF DIGITAL ELEVATION MODEL RESOLUTION ON TOPOGRAPHIC CORRECTION OF AIRBORNE SAR, International journal of remote sensing (Print), 19(16), 1998, pp. 3075-3096

Authors: TIWARI GB SRIVASTAVA SP PANDEY DC PUROHIT RC SAXENA AK GOYAL SK RAWAT TS
Citation: Gb. Tiwari et al., THERMALLY-INDUCED PHASE-TRANSITIONS IN PETROLEUM WAXES FROM SOME TYPICAL INDIAN CRUDE OILS, Petroleum science and technology, 15(3-4), 1997, pp. 335-346

Authors: TIWARI GB TYAGI OS SRIVASTAVA SP PANDEY DC GOYAL SK KAPOOR VB
Citation: Gb. Tiwari et al., PHASE-TRANSITION STUDIES IN PETROLEUM WAXES THROUGH FT-IR SPECTROSCOPY AND CALORIMETRY, INDIAN JOURNAL OF CHEMICAL TECHNOLOGY, 4(1), 1997, pp. 29-33

Authors: GOYAL SK
Citation: Sk. Goyal, OBSERVATION ON THE ECONOMIC LOT SCHEDULING PROBLEM - THEORY AND PRACTICE, International journal of production economics, 50(1), 1997, pp. 61-61

Authors: GOYAL SK
Citation: Sk. Goyal, JOINT VENDOR-BUYER POLICY IN JIT MANUFACTURING, The Journal of the Operational Research Society, 48(5), 1997, pp. 550-550

Authors: VISWANATHAN S GOYAL SK
Citation: S. Viswanathan et Sk. Goyal, OPTIMAL CYCLE TIME AND PRODUCTION-RATE IN A FAMILY PRODUCTION CONTEXTWITH SHELF-LIFE CONSIDERATIONS, International Journal of Production Research, 35(6), 1997, pp. 1703-1711

Authors: GOYAL SK SINGH BV NAGPAL V MARWAHA TS
Citation: Sk. Goyal et al., AN IMPROVED METHOD FOR PRODUCTION OF ALGAL BIOFERTILIZER, Indian Journal of Agricultural Sciences, 67(7), 1997, pp. 314-315

Authors: GOYAL SK SETH R HANDA BK
Citation: Sk. Goyal et al., DIPHASIC FIXED-FILM BIOMETHANATION OF DISTILLERY SPENTWASH, Bioresource technology, 56(2-3), 1996, pp. 239-244

Authors: GOYAL SK
Citation: Sk. Goyal, NOTE ON AN EOQ MODEL WITH A TEMPORARY SALE PRICE - A COMMENT, International journal of production economics, 43(2-3), 1996, pp. 283-284

Authors: GOYAL SK
Citation: Sk. Goyal, AN EOQ MODEL WITH SUBSTITUTIONS BETWEEN PRODUCTS, The Journal of the Operational Research Society, 47(3), 1996, pp. 476-477

Authors: GOYAL SK HARIGA MA ALYAN A
Citation: Sk. Goyal et al., THE TRENDED INVENTORY LOT-SIZING PROBLEM WITH SHORTAGES UNDER A NEW REPLENISHMENT POLICY, The Journal of the Operational Research Society, 47(10), 1996, pp. 1286-1295

Authors: GOYAL SK
Citation: Sk. Goyal, A NOTE ON DEALING WITH A SHELF-LIFE CONSTRAINT IN CYCLIC SCHEDULING BY ADJUSTING BOTH CYCLE TIME AND PRODUCTION-RATE - DISCUSSION, International Journal of Production Research, 34(10), 1996, pp. 2967-2969

Authors: GOYAL SK
Citation: Sk. Goyal, DETERMINING ECONOMIC REPLENISHMENT INTERVAL FOR LINEAR TREND IN DEMAND (VOL 34, PG 115, 1994), International journal of production economics, 38(2-3), 1995, pp. 293-293

Authors: SETH R GOYAL SK HANDA BK
Citation: R. Seth et al., FIXED-FILM BIOMETHANATION OF DISTILLERY SPENTWASH USING LOW-COST POROUS-MEDIA, Resources, conservation and recycling, 14(2), 1995, pp. 79-89

Authors: GOYAL SK
Citation: Sk. Goyal, A ONE-VENDOR MULTI-BUYER INTEGRATED INVENTORY MODEL - A COMMENT, European journal of operational research, 82(1), 1995, pp. 209-210

Authors: GOYAL SK GUNASEKARAN A
Citation: Sk. Goyal et A. Gunasekaran, AN INTEGRATED PRODUCTION-INVENTORY-MARKETING MODEL FOR DETERIORATING ITEMS, Computers & industrial engineering, 28(4), 1995, pp. 755-762

Authors: HARIGA MA GOYAL SK
Citation: Ma. Hariga et Sk. Goyal, AN ALTERNATIVE PROCEDURE FOR DETERMINING THE OPTIMAL POLICY FOR AN INVENTORY ITEM HAVING LINEAR TREND IN DEMAND, The Journal of the Operational Research Society, 46(4), 1995, pp. 521-527

Authors: GOYAL SK
Citation: Sk. Goyal, AN OPTIMAL METHOD FOR A DETERMINISTIC JOINT REPLENISHMENT INVENTORY POLICY IN DISCRETE-TIME, The Journal of the Operational Research Society, 46(11), 1995, pp. 1404-1404

Authors: GOYAL SK GUNASEKARAN A
Citation: Sk. Goyal et A. Gunasekaran, MODELING AND ANALYSIS OF JUST-IN-TIME MANUFACTURING SYSTEMS, International journal of operations & production management, 15(9), 1995, pp. 8-8

Authors: GOYAL SK
Citation: Sk. Goyal, THE INFLUENCE OF POLYMER STRUCTURE ON MELT STRENGTH BEHAVIOR OF PE RESINS (VOL 51, PG 25, 1995), Plastics engineering, 51(4), 1995, pp. 12-13

Authors: GOYAL SK
Citation: Sk. Goyal, THE INFLUENCE OF POLYMER STRUCTURE ON MELT STRENGTH BEHAVIOR OF PE RESINS, Plastics engineering, 51(2), 1995, pp. 25-28

Authors: GOYAL SK
Citation: Sk. Goyal, A NOTE ON EFFECT OF PRODUCTION COST ON SHELF-LIFE - COMMENT, International Journal of Production Research, 33(12), 1995, pp. 3487-3487
Risultati: 1-25 | 26-41