AAAAAA

   
Results: 1-6 |
Results: 6

Authors: Golenko-Ginzburg, D Laslo, Z
Citation: D. Golenko-ginzburg et Z. Laslo, Timing control points via simulation for production systems under random disturbances, MATH COMP S, 54(6), 2001, pp. 451-458

Authors: Golenko-Ginzburg, D Kats, V Papic, L
Citation: D. Golenko-ginzburg et al., A high-speed reallocation algorithm for controlling man-machine productionsystems, PROD PLAN C, 11(3), 2000, pp. 271-280

Authors: Golenko-Ginzburg, D Aharon, G Shimon, S
Citation: D. Golenko-ginzburg et al., Two-level cost-optimization production control model under random disturbances, MATH COMP S, 52(5-6), 2000, pp. 381-398

Authors: Golenko-Ginzburg, D Kats, V Sitnyakovskii, S Itskovich, EL
Citation: D. Golenko-ginzburg et al., Control of the three-level "man-computer" production system, AUT REMOT R, 61(5), 2000, pp. 866-882

Authors: Golenko-Ginzburg, D Gonik, A Papic, L
Citation: D. Golenko-ginzburg et al., Developing cost-optimization production control model via simulation, MATH COMP S, 49(6), 1999, pp. 335-351

Authors: Voropaev, VI Lyubkin, SM Golenko-Ginzburg, D
Citation: Vi. Voropaev et al., Decision-making models for generalized alternative stochastic networks, AUT REMOT R, 60(10), 1999, pp. 1484-1490
Risultati: 1-6 |