Citation: D. Golenko-ginzburg et Z. Laslo, Timing control points via simulation for production systems under random disturbances, MATH COMP S, 54(6), 2001, pp. 451-458
Citation: D. Golenko-ginzburg et al., A high-speed reallocation algorithm for controlling man-machine productionsystems, PROD PLAN C, 11(3), 2000, pp. 271-280
Citation: D. Golenko-ginzburg et al., Two-level cost-optimization production control model under random disturbances, MATH COMP S, 52(5-6), 2000, pp. 381-398