Login
|
New Account
AAAAAA
ITA
ENG
Results:
1-25
|
26-30
|
Results: 26-30/30
GO BACK TO THE BASICS TO CALCULATE PRESSURE
Authors:
HODEL AE
Citation:
Ae. Hodel, GO BACK TO THE BASICS TO CALCULATE PRESSURE, Chemical processing, 58(1), 1995, pp. 10-10
BELT FILTER AND FLUID-BED DRYER DOUBLE POWDER PRODUCTION-RATE
Authors:
JOHNSON G HODEL AE
Citation:
G. Johnson et Ae. Hodel, BELT FILTER AND FLUID-BED DRYER DOUBLE POWDER PRODUCTION-RATE, Chemical processing, 58(1), 1995, pp. 51-51
TAKE COGNIZANCE OF PRESSURE-DROP WHEN SIZING RELIEF CONTAINMENT
Authors:
HODEL AE
Citation:
Ae. Hodel, TAKE COGNIZANCE OF PRESSURE-DROP WHEN SIZING RELIEF CONTAINMENT, Chemical processing, 57(12), 1994, pp. 12-13
CALCULATING THE TIME REQUIRED TO DEPRESSURIZE A REACTOR
Authors:
HODEL AE
Citation:
Ae. Hodel, CALCULATING THE TIME REQUIRED TO DEPRESSURIZE A REACTOR, Chemical processing, 57(11), 1994, pp. 10-10
DRY VACUUM PUMP SAFEGUARDS HIGH-PURITY, LOW-TEMPERATURE
Authors:
HODEL AE
Citation:
Ae. Hodel, DRY VACUUM PUMP SAFEGUARDS HIGH-PURITY, LOW-TEMPERATURE, Chemical processing, 57(11), 1994, pp. 59-60
Risultati:
1-25
|
26-30
|