Citation: Dw. Wang et al., A FUZZY DUE-DATE BARGAINER FOR THE MAKE-TO-ORDER MANUFACTURING SYSTEMS, IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 28(3), 1998, pp. 492-497
Authors:
HODGSON TJ
ZAMAN SM
COOPER JR
FORSTER DMC
Citation: Tj. Hodgson et al., PROXIMAL ANEURYSMS IN ASSOCIATION WITH ARTERIOVENOUS-MALFORMATIONS - DO THEY RESOLVE FOLLOWING OBLITERATION OF THE MALFORMATION WITH STEREOTACTIC RADIOSURGERY, British journal of neurosurgery, 12(5), 1998, pp. 434-437
Citation: Tj. Hodgson et al., DYNAMIC LOT SIZE SEQUENCING POLICIES IN A MULTIPRODUCT, SINGLE-MACHINE SYSTEM/, IIE transactions, 29(2), 1997, pp. 127-137
Citation: Tj. Hodgson et al., THE ROLE OF IMAGING IN THE FOLLOW-UP OF MENINGIOMAS, Journal of Neurology, Neurosurgery and Psychiatry, 59(5), 1995, pp. 545-547
Citation: Tj. Hodgson et al., THROMBOLYSIS AND ANGIOPLASTY FOR ACUTE LOWER-LIMB ISCHEMIA IN BUERGERS-DISEASE, Cardiovascular and interventional radiology, 17(6), 1994, pp. 333-335
Citation: Tj. Hodgson et Al. Soyster, MANUFACTURING RESEARCH AND THE EXPANDING ROLE OF INDUSTRIAL-ENGINEERING, Industrial engineering, 26(7), 1994, pp. 69-69