Results: 1-14 |
Results: 14

Authors: Ravindran, B Kachroo, P Hegazy, T
Citation: B. Ravindran et al., Intelligent feedback control-based adaptive resource management for asynchronous, decentralized real-time systems, IEEE SYST C, 31(2), 2001, pp. 261-265

Authors: Elbeltagi, E Hegazy, T
Citation: E. Elbeltagi et T. Hegazy, A hybrid AI-based system for site layout planning in construction, COMPUT-A CI, 16(2), 2001, pp. 79-93

Authors: Hegazy, T Ersahin, T
Citation: T. Hegazy et T. Ersahin, Simplified spreadsheet solutions. I: Subcontractor information system, J CONS ENG, 127(6), 2001, pp. 461-468

Authors: Hegazy, T Ersahin, T
Citation: T. Hegazy et T. Ersahin, Simplified spreadsheet solutions. II: Overall schedule optimization, J CONS ENG, 127(6), 2001, pp. 469-475

Authors: Hegazy, T Zaneldin, E Grierson, D
Citation: T. Hegazy et al., Improving design coordination for building projects. I: Information model, J CONS ENG, 127(4), 2001, pp. 322-329

Authors: Zaneldin, E Hegazy, T Grierson, D
Citation: E. Zaneldin et al., Improving design coordination for building projects. II: A collaborative system, J CONS ENG, 127(4), 2001, pp. 330-336

Authors: Hegazy, T Wassef, N
Citation: T. Hegazy et N. Wassef, Cost optimization in projects with repetitive nonserial activities, J CONS ENG, 127(3), 2001, pp. 183-191

Authors: Karray, F Zaneldin, E Hegazy, T Shabeeb, AHM Elbeltagi, E
Citation: F. Karray et al., Tools of soft computing as applied to the problem of facilities layout planning, IEEE FUZ SY, 8(4), 2000, pp. 367-379

Authors: Hegazy, T Shabeeb, AK Elbeltagi, E Cheema, T
Citation: T. Hegazy et al., Algorithm for scheduling with multiskilled constrained resources, J CONS ENG, 126(6), 2000, pp. 414-421

Authors: McKim, R Hegazy, T Attalla, M
Citation: R. Mckim et al., Project performance control in reconstruction projects, J CONS ENG, 126(2), 2000, pp. 137-141

Authors: Hegazy, T Elbeltagi, E
Citation: T. Hegazy et E. Elbeltagi, EvoSite: Evolution-based model for site layout planning, J COMP CIV, 13(3), 1999, pp. 198-206

Authors: Hegazy, T
Citation: T. Hegazy, Optimization of resource allocation and leveling using genetic algorithms, J CONS ENG, 125(3), 1999, pp. 167-175

Authors: Hegazy, T
Citation: T. Hegazy, Optimization of construction time-cost trade-off analysis using genetic algorithms, CAN J CIV E, 26(6), 1999, pp. 685-697

Authors: Hegazy, T Tully, S Marzouk, H
Citation: T. Hegazy et al., A neural network approach for predicting the structural behavior of concrete slabs, CAN J CIV E, 25(4), 1998, pp. 668-677
Risultati: 1-14 |