AAAAAA

   
Results: 1-5 |
Results: 5

Authors: IBRAHIM Y
Citation: Y. Ibrahim, COMPARISON BETWEEN FAILURE SEQUENCE AND FAILURE PATH FOR BRITTLE SYSTEMS, Computers & structures, 65(4), 1997, pp. 625-631

Authors: LIONG SY SHREERAM J IBRAHIM Y
Citation: Sy. Liong et al., CATCHMENT CALIBRATION USING FRACTIONAL-FACTORIAL AND CENTRAL-COMPOSITE-DESIGNS-BASED RESPONSE-SURFACE, Journal of hydraulic engineering, 121(6), 1995, pp. 507-510

Authors: LIONG SY IBRAHIM Y
Citation: Sy. Liong et Y. Ibrahim, ESTIMATION OF PEAK FLOW AND RUNOFF VOLUME WITH RESPONSE-SURFACE METHOD, Journal of water resources planning and management, 120(2), 1994, pp. 161-174

Authors: IBRAHIM Y LIONG SY
Citation: Y. Ibrahim et Sy. Liong, A METHOD OF ESTIMATING OPTIMAL CATCHMENT MODEL PARAMETERS, Water resources research, 29(9), 1993, pp. 3049-3058

Authors: ABDULJABBAR HSO IBRAHIM Y ELAHI TF TAWFIQ AK KHOJA M
Citation: Hso. Abduljabbar et al., USE OF THE COMPUTER FOR INTERPRETATION OF FETAL HEART TRACINGS, International journal of gynaecology and obstetrics, 42(3), 1993, pp. 251-254
Risultati: 1-5 |