Citation: Yd. Kim et al., DUE-DATE BASED SCHEDULING AND CONTROL POLICIES IN A MULTIPRODUCT SEMICONDUCTOR WAFER FABRICATION FACILITY, IEEE transactions on semiconductor manufacturing, 11(1), 1998, pp. 155-164
Citation: Dh. Lee et al., MULTIPERIOD PART SELECTION AND LOADING PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEMS, Computers & industrial engineering, 33(3-4), 1997, pp. 541-544