AAAAAA

   
Results: 1-8 |
Results: 8

Authors: Jaber, MY Abboud, NE
Citation: My. Jaber et Ne. Abboud, The impact of random machine unavailability on inventory policies in a continuous improvement environment, PROD PLAN C, 12(8), 2001, pp. 754-763

Authors: Jaber, MY Bonney, M
Citation: My. Jaber et M. Bonney, Economic lot sizing with learning and continuous time discounting: Is it significant?, INT J PRO E, 71(1-3), 2001, pp. 135-143

Authors: Jaber, MY Bonney, M
Citation: My. Jaber et M. Bonney, A comment on Zhou YW and Lau H-S (1998). Optimal production lot-sizing model considering the bounded learning case and shortages backordered. J OplRes Soc 49 : 1206-1211, J OPER RES, 52(5), 2001, pp. 584-590

Authors: Jaber, MY Bonney, M
Citation: My. Jaber et M. Bonney, A comment on Zhou YW and Lau H-S (1998). Optimal production lot-sizing model considering the bounded learning case and shortages backordered. J OplRes Soc 49 : 1206-1211 - Comments on Zhou & Lau's reply, J OPER RES, 52(5), 2001, pp. 591-592

Authors: Salameh, MK Jaber, MY
Citation: Mk. Salameh et My. Jaber, Economic production quantity model for items with imperfect quality, INT J PRO E, 64(1-3), 2000, pp. 59-64

Authors: Abboud, NE Jaber, MY Noueihed, NA
Citation: Ne. Abboud et al., Economic lot sizing with the consideration of random machine unavailability time, COMPUT OPER, 27(4), 2000, pp. 335-351

Authors: Salameh, MK Jaber, MY Noueihed, N
Citation: Mk. Salameh et al., Effect of deteriorating items on the instantaneous replenishment model, PROD PLAN C, 10(2), 1999, pp. 175-180

Authors: Jaber, MY Bonney, M
Citation: My. Jaber et M. Bonney, The economic manufacture/order quantity (EMQ/EOQ) and the learning curve: Past, present, and future, INT J PRO E, 59(1-3), 1999, pp. 93-102
Risultati: 1-8 |