AAAAAA

   
Results: 1-5 |
Results: 5

Authors: BALL MO KAKU BK VAKHUTINSKY A
Citation: Mo. Ball et al., NETWORK-BASED FORMULATIONS OF THE QUADRATIC ASSIGNMENT PROBLEM, European journal of operational research, 104(1), 1998, pp. 241-249

Authors: FU MC KAKU BK
Citation: Mc. Fu et Bk. Kaku, MINIMIZING WORK-IN-PROCESS AND MATERIAL HANDLING IN THE FACILITIES LAYOUT PROBLEM, IIE transactions, 29(1), 1997, pp. 29-36

Authors: KAKU BK KRAJEWSKI LJ
Citation: Bk. Kaku et Lj. Krajewski, PERIOD BATCH CONTROL IN GROUP TECHNOLOGY, International Journal of Production Research, 33(1), 1995, pp. 79-99

Authors: KAKU BK
Citation: Bk. Kaku, FITTING FLEXIBLE MANUFACTURING SYSTEMS TO THE TASK, Industrial engineering, 26(11), 1994, pp. 38-40

Authors: VAKHARIA AJ KAKU BK
Citation: Aj. Vakharia et Bk. Kaku, REDESIGNING A CELLULAR MANUFACTURING SYSTEM TO HANDLE LONG-TERM DEMAND CHANGES - A METHODOLOGY AND INVESTIGATION, Decision sciences, 24(5), 1993, pp. 909-930
Risultati: 1-5 |