AAAAAA

   
Results: 1-8 |
Results: 8

Authors: KIMMS A
Citation: A. Kimms, SELECTING PRODUCTION PLANNING METHODS VIA CASE-BASED REASONING, Wirtschaftsinformatik, 40(5), 1998, pp. 417

Authors: KIMMS A
Citation: A. Kimms, STABILITY MEASURES FOR POLLING SCHEDULES WITH APPLICATIONS TO CAPACITY EXPANSION PLANNING, MASTER PRODUCTION SCHEDULING, AND LOT-SIZING, Omega (Oxford), 26(3), 1998, pp. 355-366

Authors: KIMMS A DREXL A
Citation: A. Kimms et A. Drexl, SOME INSIGHTS INTO PROPORTIONAL LOT-SIZING AND SCHEDULING, The Journal of the Operational Research Society, 49(11), 1998, pp. 1196-1205

Authors: KIMMS A DREXL A
Citation: A. Kimms et A. Drexl, PROPORTIONAL LOT-SIZING AND SCHEDULING - SOME EXTENSIONS, Networks, 32(2), 1998, pp. 85-101

Authors: KIMMS A
Citation: A. Kimms, DEMAND SHUFFLE - A METHOD FOR MULTILEVEL PROPORTIONAL LOT-SIZING AND SCHEDULING, Naval research logistics, 44(4), 1997, pp. 319-340

Authors: DREXL A KIMMS A
Citation: A. Drexl et A. Kimms, LOT-SIZING AND SCHEDULING - SURVEY AND EXTENSIONS, European journal of operational research, 99(2), 1997, pp. 221-235

Authors: KIMMS A
Citation: A. Kimms, MULTILEVEL, SINGLE-MACHINE LOT-SIZING AND SCHEDULING (WITH INITIAL INVENTORY), European journal of operational research, 89(1), 1996, pp. 86-99

Authors: KIMMS A
Citation: A. Kimms, COMPETITIVE METHODS FOR MULTILEVEL LOT-SIZING AND SCHEDULING - TABU SEARCH AND RANDOMIZED REGRETS, International Journal of Production Research, 34(8), 1996, pp. 2279-2298
Risultati: 1-8 |