Citation: Jh. Jung et al., A GENETIC ALGORITHM FOR SCHEDULING OF MULTIPRODUCT BATCH PROCESSES, Computers & chemical engineering, 22(11), 1998, pp. 1725-1730
Citation: Jh. Park et al., CLOSED-LOOP ONLINE PROCESS IDENTIFICATION USING A PROPORTIONAL CONTROLLER, Chemical Engineering Science, 53(9), 1998, pp. 1713-1724
Citation: Sw. Sung et al., ONLINE PROCESS IDENTIFICATION AND AUTOMATIC TUNING METHOD FOR PID CONTROLLERS, Chemical Engineering Science, 53(10), 1998, pp. 1847-1859
Citation: Jh. Ryu et Ib. Lee, A NEW COMPLETION-TIME ALGORITHM CONSIDERING AN OUT-OF-PHASE POLICY INBATCH PROCESSES, Industrial & engineering chemistry research, 36(12), 1997, pp. 5321-5328
Citation: Hj. Kwak et al., ONLINE PROCESS IDENTIFICATION AND AUTOTUNING FOR INTEGRATING PROCESSES, Industrial & engineering chemistry research, 36(12), 1997, pp. 5329-5338
Citation: Hi. Park et al., ONLINE PROCESS IDENTIFICATION USING THE LAGUERRE SERIES FOR AUTOMATICTUNING OF THE PROPORTIONAL-INTEGRAL-DERIVATIVE CONTROLLER, Industrial & engineering chemistry research, 36(1), 1997, pp. 101-111
Citation: Hj. Kim et al., A HYBRID SYSTEM OF HEURISTICS AND SIMULATED ANNEALING FOR LARGE-SIZE SCHEDULING PROBLEMS OF BATCH PROCESSES WITH PIPELESS INTERMEDIATE STORAGE, The Korean journal of chemical engineering, 14(4), 1997, pp. 225-232
Citation: H. Lee et al., ANALYSIS AND OPERATION OF COOLING WATER FLOWS IN A HEAT-EXCHANGERS NETWORK, The Korean journal of chemical engineering, 14(4), 1997, pp. 257-262
Citation: Ms. Kim et Ib. Lee, RULE-BASED REACTIVE RESCHEDULING SYSTEM FOR MULTIPURPOSE BATCH PROCESSES, Computers & chemical engineering, 21, 1997, pp. 1197-1202
Citation: M. Kim et al., OPTIMAL SCHEDULING OF MULTIPRODUCT BATCH PROCESSES FOR VARIOUS INTERMEDIATE STORAGE POLICIES, Industrial & engineering chemistry research, 35(11), 1996, pp. 4058-4066
Citation: M. Kim et al., INTELLIGENT SCHEDULING AND MONITORING FOR MULTIPRODUCT NETWORKED BATCH PROCESSES, Computers & chemical engineering, 20, 1996, pp. 1149-1154
Citation: Hk. Lee et Ib. Lee, A SYNTHESIS OF MULTIPRODUCT BATCH PLANTS CONSIDERING BOTH IN-PHASE AND OUT-OF-PHASE MODES, Computers & chemical engineering, 20, 1996, pp. 195-200
Citation: Hk. Lee et al., AN EVOLUTIONARY APPROACH TO OPTIMAL SYNTHESIS OF MULTIPRODUCT BATCH PLANT, Computers & chemical engineering, 20(9), 1996, pp. 1149-1157
Citation: Jh. Jung et al., COMPLETION TIMES ALGORITHM OF MULTIPRODUCT BATCH PROCESSES FOR COMMONINTERMEDIATE STORAGE POLICY (CIS) WITH NONZERO TRANSFER AND SET-UP TIMES, Computers & chemical engineering, 20(6-7), 1996, pp. 845-852
Citation: Sw. Sung et al., AUTOMATIC TUNING OF PID CONTROLLER USING 2ND-ORDER PLUS TIME DELAY MODEL, Journal of Chemical Engineering of Japan, 29(6), 1996, pp. 990-999