Login
|
New Account
AAAAAA
ITA
ENG
Results:
1-5
|
Results: 5
Scheduling in the two-machine flowshop with due date constraints
Authors:
Lin, BMT
Citation:
Bmt. Lin, Scheduling in the two-machine flowshop with due date constraints, INT J PRO E, 70(2), 2001, pp. 117-123
Batch scheduling in the no-wait two-machine flowshop to minimize the makespan
Authors:
Lin, BMT Cheng, TCE
Citation:
Bmt. Lin et Tce. Cheng, Batch scheduling in the no-wait two-machine flowshop to minimize the makespan, COMPUT OPER, 28(7), 2001, pp. 613-624
An application of parallel virtual machine framework to film production problem
Authors:
Shyu, SJ Lin, BMT
Citation:
Sj. Shyu et Bmt. Lin, An application of parallel virtual machine framework to film production problem, COMPUT MATH, 39(12), 2000, pp. 53-62
Makespan minimization in the two-machine flowshop batch scheduling problem
Authors:
Cheng, TCE Lin, BMT Toker, A
Citation:
Tce. Cheng et al., Makespan minimization in the two-machine flowshop batch scheduling problem, NAV RES LOG, 47(2), 2000, pp. 128-144
The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine
Authors:
Lin, BMT
Citation:
Bmt. Lin, The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine, COMPUT OPER, 26(7), 1999, pp. 695-698
Risultati:
1-5
|