AAAAAA

   
Results: 1-5 |
Results: 5

Authors: Lin, BMT
Citation: Bmt. Lin, Scheduling in the two-machine flowshop with due date constraints, INT J PRO E, 70(2), 2001, pp. 117-123

Authors: Lin, BMT Cheng, TCE
Citation: Bmt. Lin et Tce. Cheng, Batch scheduling in the no-wait two-machine flowshop to minimize the makespan, COMPUT OPER, 28(7), 2001, pp. 613-624

Authors: Shyu, SJ Lin, BMT
Citation: Sj. Shyu et Bmt. Lin, An application of parallel virtual machine framework to film production problem, COMPUT MATH, 39(12), 2000, pp. 53-62

Authors: Cheng, TCE Lin, BMT Toker, A
Citation: Tce. Cheng et al., Makespan minimization in the two-machine flowshop batch scheduling problem, NAV RES LOG, 47(2), 2000, pp. 128-144

Authors: Lin, BMT
Citation: Bmt. Lin, The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine, COMPUT OPER, 26(7), 1999, pp. 695-698
Risultati: 1-5 |