Citation: Ws. Yoo et La. Martinvega, A DECOMPOSITION METHODOLOGY FOR SCHEDULING SEMICONDUCTOR TEST OPERATIONS FOR NUMBER OF TARDY JOB MEASURES, JOURNAL OF ELECTRONICS MANUFACTURING, 7(1), 1997, pp. 51-61
Citation: Yce. Li et al., FLOW-TIME PERFORMANCE OF MODIFIED SCHEDULING HEURISTICS IN A DYNAMIC RESCHEDULING ENVIRONMENT, Computers & industrial engineering, 31(1-2), 1996, pp. 213-216
Authors:
MCDUFFIE EL
SCHNEIDER M
BUONI FB
SHNAIDER E
SCHNEIDER M
MARTINVEGA LA
Citation: El. Mcduffie et al., USING SCHEDULING IN FLEXIBLE MANUFACTURING SYSTEMS, Engineering applications of artificial intelligence, 8(6), 1995, pp. 681-688
Authors:
MARTINVEGA LA
BROWN HK
SHAW WH
SANDERS TJ
Citation: La. Martinvega et al., INDUSTRIAL PERSPECTIVE ON RESEARCH NEEDS AND OPPORTUNITIES IN MANUFACTURING ASSEMBLY, Journal of manufacturing systems, 14(1), 1995, pp. 45-58
Citation: R. Uzsoy et al., A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY .2. SHOP-FLOOR CONTROL, IIE transactions, 26(5), 1994, pp. 44-55
Citation: R. Uzsoy et al., PRODUCTION SCHEDULING ALGORITHMS FOR A SEMICONDUCTOR TEST FACILITY, IEEE transactions on semiconductor manufacturing, 4(4), 1991, pp. 270-280