AAAAAA

   
Results: 1-5 |
Results: 5

Authors: WONG FY FONG DK MCINTYRE FJ KUEHNE DL
Citation: Fy. Wong et al., DESIGN AND FIELD TRIAL APPLICATION OF FOAM IN PRODUCTION WELLS TO IMPROVE CONFORMANCE, Journal of Canadian Petroleum Technology, 36(2), 1997, pp. 21-32

Authors: FONG DK WONG FY MCINTYRE FJ
Citation: Dk. Fong et al., AN UNEXPECTED BENEFIT OF HORIZONTAL WELLS ON OFFSET VERTICAL WELL PRODUCTIVITY IN VERTICAL MISCIBLE FLOODS, Journal of Canadian Petroleum Technology, 35(9), 1996, pp. 70-79

Authors: MCINTYRE FJ HUNTER B SEE D WONG F FONG D ADAMACHE I
Citation: Fj. Mcintyre et al., REDEVELOPING MATURE MISCIBLE FLOOD RESERVOIRS WITH HORIZONTAL WELLS -A SUMMARY OF 6 YEARS OF EXPERIENCE, Journal of Canadian Petroleum Technology, 35(3), 1996, pp. 54-62

Authors: MCINTYRE FJ MCCLOY R
Citation: Fj. Mcintyre et R. Mccloy, SHAVING PATIENTS BEFORE OPERATION - A DANGEROUS MYTH, Annals of the Royal College of Surgeons of England, 76(1), 1994, pp. 3-4

Authors: ADAMACHE I MCINTYRE FJ POW M LEWIS D DAVIS R BUTLER S KUHME A BLOY G VANREGAN N SHEPPARD G GRENON JP
Citation: I. Adamache et al., HORIZONTAL WELL APPLICATION IN A VERTICAL MISCIBLE FLOOD, Journal of Canadian Petroleum Technology, 33(3), 1994, pp. 19-25
Risultati: 1-5 |