Citation: Vj. Leon et Ba. Peters, A COMPARISON OF SETUP STRATEGIES FOR PRINTED-CIRCUIT BOARD ASSEMBLY, Computers & industrial engineering, 34(1), 1998, pp. 219-234
Citation: S. Mahajan et al., A RETRIEVAL SEQUENCING HEURISTIC FOR MINILOAD END-OF-AISLE AUTOMATED STORAGE RETRIEVAL SYSTEMS/, International Journal of Production Research, 36(6), 1998, pp. 1715-1731
Citation: M. Rajasekharan et al., A GENETIC ALGORITHM FOR FACILITY LAYOUT DESIGN IN FLEXIBLE MANUFACTURING SYSTEMS, International Journal of Production Research, 36(1), 1998, pp. 95-110
Citation: Ba. Peters et T. Yang, INTEGRATED FACILITY LAYOUT AND MATERIAL HANDLING-SYSTEM DESIGN IN SEMICONDUCTOR FABRICATION FACILITIES, IEEE transactions on semiconductor manufacturing, 10(3), 1997, pp. 360-369
Citation: Th. Yang et Ba. Peters, A SPINE LAYOUT DESIGN METHOD FOR SEMICONDUCTOR FABRICATION FACILITIESCONTAINING AUTOMATED MATERIAL-HANDLING SYSTEMS, International journal of operations & production management, 17(5-6), 1997, pp. 490
Citation: Vj. Leon et Ba. Peters, REPLANNING AND ANALYSIS OF PARTIAL SETUP STRATEGIES IN PRINTED-CIRCUIT BOARD ASSEMBLY SYSTEMS, International journal of flexible manufacturing systems, 8(4), 1996, pp. 389-411
Citation: Ba. Peters et M. Rajasekharan, A GENETIC ALGORITHM FOR DETERMINING FACILITY DESIGN AND CONFIGURATIONOF SINGLE-STAGE FLEXIBLE ELECTRONIC ASSEMBLY SYSTEMS, Journal of manufacturing systems, 15(5), 1996, pp. 316-324
Citation: Ba. Peters et Gs. Subramanian, ANALYSIS OF PARTIAL SETUP STRATEGIES FOR SOLVING THE OPERATIONAL PLANNING PROBLEM IN PARALLEL MACHINE ELECTRONIC ASSEMBLY SYSTEMS, International Journal of Production Research, 34(4), 1996, pp. 999-1021
Citation: Ba. Peters et al., LEAF DEVELOPMENT IN RELATION TO INFECTION BY STAGONOSPORA-NODORUM ANDSEPTORIA-TRITICI IN WHEAT, Australian Journal of Agricultural Research, 47(7), 1996, pp. 1169-1179
Citation: A. Keserla et Ba. Peters, ANALYSIS OF DUAL-SHUTTLE AUTOMATED STORAGE-RETRIEVAL SYSTEMS, Journal of manufacturing systems, 13(6), 1994, pp. 424-434