Citation: B. Pourbabai et al., OPTIMIZING FLOW-RATES IN A QUEUING NETWORK WITH SIDE CONSTRAINTS, European journal of operational research, 88(3), 1996, pp. 586-591
Citation: B. Pourbabai, LOADING STRATEGIES FOR A CLASS OF JUST-IN-TIME MANUFACTURING SYSTEM, International journal, advanced manufacturing technology, 10(1), 1995, pp. 46-51
Citation: B. Pourbabai, DESIGN OF A FLEXIBLE ASSEMBLY-LINE TO CONTROL THE BOTTLENECK, Computer-integrated manufacturing systems, 7(2), 1994, pp. 122-133
Citation: B. Pourbabai, TANDEM BEHAVIOR OF A FINITE-CAPACITY G M/1 QUEUING SYSTEM WITH INSTANTANEOUS BERNOULLI FEEDBACK - AN ALGORITHM/, International Journal of Systems Science, 25(12), 1994, pp. 2297-2308
Citation: B. Pourbabai et M. Pecht, MANAGEMENT OF DESIGN ACTIVITIES IN A CONCURRENT ENGINEERING ENVIRONMENT, International Journal of Production Research, 32(4), 1994, pp. 821-832
Citation: B. Pourbabai, OPERATING A FLEXIBLE ASSEMBLY-LINE - TO CONTROL THE BOTTLENECK, European journal of operational research, 71(3), 1993, pp. 353-365
Citation: B. Pourbabai, AN OPERATIONAL STRATEGY FOR THROUGHPUT MAXIMIZATION AND BOTTLENECK CONTROL IN AN ASSEMBLY-LINE SYSTEM - BY SELECTION OF THE PROCESSING RATES, The Journal of the Operational Research Society, 44(10), 1993, pp. 1003-1011