Citation: P. Montulet et al., MINIMIZING THE PEAK LOAD - AN ALTERNATE OBJECTIVE FOR DEDICATED STORAGE POLICIES, International Journal of Production Research, 36(5), 1998, pp. 1369-1385
Citation: P. Montulet et al., PROBLEM OF SHARED STORAGE-OPTIMIZATION - EXACT AND HEURISTIC METHOD, INFOR. Information systems and operational research, 35(2), 1997, pp. 138-153
Citation: A. Langevin et al., DISPATCHING, ROUTING, AND SCHEDULING OF 2 AUTOMATED GUIDED VEHICLES IN A FLEXIBLE MANUFACTURING SYSTEM, International journal of flexible manufacturing systems, 8(3), 1996, pp. 247-262