Citation: H. Sarper et al., GREATEST CRITICAL DIFFERENCE STATISTICS IN K-OUT-OF-N RELIABILITY STRUCTURES, Journal of spacecraft and rockets, 35(2), 1998, pp. 232-235
Citation: H. Sarper, MINIMIZING THE SUM OF ABSOLUTE DEVIATIONS ABOUT A COMMON DUE-DATE FORTHE 2-MACHINE FLOW-SHOP PROBLEM, Applied mathematical modelling, 19(3), 1995, pp. 153-161
Citation: H. Sarper, EVALUATION OF OPTIMIZATION METHODS FOR MACHINING ECONOMICS MODELS - COMMENTS AND CORRECTIONS, Computers & operations research, 22(2), 1995, pp. 247-248
Citation: H. Sarper, RESOLUTION OF THE PROCESS SYNTHESIS PROBLEM BY PIBOULEAU ET-AL, Hungarian journal of industrial chemistry, 23(4), 1995, pp. 261-262
Citation: H. Sarper, NO SPECIAL SCHEMES ARE NEEDED FOR SOLVING SOFTWARE-RELIABILITY OPTIMIZATION MODELS, IEEE transactions on software engineering, 21(8), 1995, pp. 701-702
Citation: H. Sarper, A SIMULATION APPROACH FOR THE ANALYSIS OF THE EFFECT OF RANDOMNESS INCUTTING SURFACE CONSTRAINTS IN THE MACHINING ECONOMICS PROBLEM, International Journal of Production Research, 33(7), 1995, pp. 1871-1880
Citation: Dp. Vigil et H. Sarper, ESTIMATING THE EFFECTS OF PARAMETER VARIABILITY ON LEARNING-CURVE MODEL PREDICTIONS, International journal of production economics, 34(2), 1994, pp. 187-200
Citation: H. Sarper et Tj. Greene, COMPARISON OF EQUIVALENT PURE CELLULAR AND FUNCTIONAL PRODUCTION ENVIRONMENTS USING SIMULATION, International journal of computer integrated manufacturing, 6(4), 1993, pp. 221-236
Citation: H. Sarper, SCHEDULING FOR THE MAINTENANCE OF COMPLETELY PROCESSED LOW-DEMAND LARGE ITEMS, Applied mathematical modelling, 17(6), 1993, pp. 321-328