AAAAAA

   
Results: 1-9 |
Results: 9

Authors: VERMEULEN STJA RIJANTO H SCHOUTEN FAV
Citation: Stja. Vermeulen et al., MODELING THE INFLUENCE OF PREVENTIVE MAINTENANCE ON PROTECTION SYSTEMRELIABILITY PERFORMANCE, IEEE transactions on power delivery, 13(4), 1998, pp. 1027-1032

Authors: SCHOUTEN FAV SCARF PA
Citation: Fav. Schouten et Pa. Scarf, 11TH EURO SUMMER INSTITUTE - OPERATIONAL-RESEARCH MODELS IN MAINTENANCE, European journal of operational research, 99(3), 1997, pp. 491-492

Authors: POURBABAI B BLANC JPC SCHOUTEN FAV
Citation: B. Pourbabai et al., OPTIMIZING FLOW-RATES IN A QUEUING NETWORK WITH SIDE CONSTRAINTS, European journal of operational research, 88(3), 1996, pp. 586-591

Authors: SCHOUTEN FAV TAPIERO CS
Citation: Fav. Schouten et Cs. Tapiero, OR MODELS FOR MAINTENANCE MANAGEMENT AND QUALITY-CONTROL, European journal of operational research, 82(2), 1995, pp. 211-213

Authors: SCHOUTEN FAV VANNESTE SG
Citation: Fav. Schouten et Sg. Vanneste, MAINTENANCE OPTIMIZATION OF A PRODUCTION SYSTEM WITH BUFFER CAPACITY, European journal of operational research, 82(2), 1995, pp. 323-338

Authors: SCHOUTEN FAV WARTENHORST P
Citation: Fav. Schouten et P. Wartenhorst, TRANSIENT ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH MARKOVIAN DEGRADING UNITS, Management science, 40(3), 1994, pp. 418-428

Authors: SCHOUTEN FAV VANEIJS MJG HEUTS RMJ
Citation: Fav. Schouten et al., COORDINATED REPLENISHMENT SYSTEMS WITH DISCOUT OPPORTUNITIES, International Journal of Production Research, 32(12), 1994, pp. 2879-2895

Authors: SCHOUTEN FAV WARTENHORST P
Citation: Fav. Schouten et P. Wartenhorst, A 2-MACHINE REPAIR MODEL WITH VARIABLE REPAIR RATE, Naval research logistics, 40(4), 1993, pp. 495-523

Authors: SCHOUTEN FAV VANNESTE SG
Citation: Fav. Schouten et Sg. Vanneste, 2 SIMPLE CONTROL POLICIES FOR A MULTICOMPONENT MAINTENANCE SYSTEM, Operations research, 41(6), 1993, pp. 1125-1136
Risultati: 1-9 |