AAAAAA

   
Results: 1-16 |
Results: 16

Authors: PARUSH A NADIR R SHTUB A
Citation: A. Parush et al., EVALUATING THE LAYOUT OF GRAPHICAL USER-INTERFACE SCREENS - VALIDATION OF A NUMERICAL COMPUTERIZED MODEL, International journal of human-computer interaction, 10(4), 1998, pp. 343-360

Authors: SHTUB A KOGAN K
Citation: A. Shtub et K. Kogan, CAPACITY PLANNING BY THE DYNAMIC MULTI-RESOURCE GENERALIZED ASSIGNMENT PROBLEM (DMRGAP), European journal of operational research, 105(1), 1998, pp. 91-99

Authors: DAREL EM SHTUB A
Citation: Em. Darel et A. Shtub, RAISING THE COMPETITIVE EDGE IN MANUFACTURING - INTRODUCTION, International journal of production economics, 51(1-2), 1997, pp. 9-10

Authors: KOGAN K KHMELNITSKY E SHTUB A MAIMON O
Citation: K. Kogan et al., OPTIMAL FLOW-CONTROL OF FLEXIBLE MANUFACTURING SYSTEMS - SETUP LOCALIZATION BY AN ITERATIVE PROCEDURE, International journal of production economics, 51(1-2), 1997, pp. 37-46

Authors: ARZI Y SHTUB A
Citation: Y. Arzi et A. Shtub, LEARNING AND FORGETTING IN MENTAL AND MECHANICAL TASKS - A COMPARATIVE-STUDY, IIE transactions, 29(9), 1997, pp. 759-768

Authors: ETGAR R SHTUB A LEBLANC LJ
Citation: R. Etgar et al., SCHEDULING PROJECTS TO MAXIMIZE NET PRESENT VALUE - THE CASE OF TIME-DEPENDENT, CONTINGENT CASH FLOWS, European journal of operational research, 96(1), 1997, pp. 90-96

Authors: BASU A BLANNING RW SHTUB A
Citation: A. Basu et al., METAGRAPHS IN HIERARCHICAL MODELING, Management science, 43(5), 1997, pp. 623-639

Authors: DASKIN MS MAIMON O SHTUB A BRAHA D
Citation: Ms. Daskin et al., GROUPING COMPONENTS IN PRINTED-CIRCUIT BOARD ASSEMBLY WITH LIMITED COMPONENT STAGING CAPACITY AND SINGLE CARD SETUP - PROBLEM CHARACTERISTICS AND SOLUTION PROCEDURES, International Journal of Production Research, 35(6), 1997, pp. 1617-1638

Authors: SHTUB A ETGAR R
Citation: A. Shtub et R. Etgar, A BRANCH-AND-BOUND ALGORITHM FOR SCHEDULING PROJECTS TO MAXIMIZE NET PRESENT VALUE - THE CASE OF TIME-DEPENDENT, CONTINGENT CASH FLOWS, International Journal of Production Research, 35(12), 1997, pp. 3367-3378

Authors: SHTUB A RAZ T
Citation: A. Shtub et T. Raz, OPTIMAL SEGMENTATION OF PROJECTS - SCHEDULE AND COST CONSIDERATIONS, European journal of operational research, 95(2), 1996, pp. 278-283

Authors: SHTUB A LEBLANC LJ CAI ZY
Citation: A. Shtub et al., SCHEDULING PROGRAMS WITH REPETITIVE PROJECTS - A COMPARISON OF A SIMULATED ANNEALING, A GENETIC AND A PAIR-WISE SWAP ALGORITHM, European journal of operational research, 88(1), 1996, pp. 124-138

Authors: BASU A HYER N SHTUB A
Citation: A. Basu et al., AN EXPERT-SYSTEM BASED APPROACH TO MANUFACTURING CELL DESIGN, International Journal of Production Research, 33(10), 1995, pp. 2739-2755

Authors: SHTUB A SIMON M
Citation: A. Shtub et M. Simon, DETERMINATION OF REORDER POINTS FOR SPARE PARTS IN A 2-ECHELON INVENTORY SYSTEM - THE CASE OF NONIDENTICAL MAINTENANCE FACILITIES, European journal of operational research, 73(3), 1994, pp. 458-464

Authors: BARD JF SHTUB A JOSHI SB
Citation: Jf. Bard et al., SEQUENCING MIXED-MODEL ASSEMBLY LINES TO LEVEL PARTS USAGE AND MINIMIZE LINE LENGTH, International Journal of Production Research, 32(10), 1994, pp. 2431-2454

Authors: SHTUB A
Citation: A. Shtub, INCREASING EFFICIENCY OF ASSEMBLY LINES THROUGH COMPUTER INTEGRATION,DYNAMIC BALANCING AND WAGE INCENTIVE, Computer-integrated manufacturing systems, 6(4), 1993, pp. 273-277

Authors: SHTUB A ZIMERMAN Y
Citation: A. Shtub et Y. Zimerman, A NEURAL-NETWORK-BASED APPROACH FOR ESTIMATING THE COST OF ASSEMBLY SYSTEMS, International journal of production economics, 32(2), 1993, pp. 189-207
Risultati: 1-16 |