Citation: T. Ganesharajah et al., DESIGN AND OPERATIONAL ISSUES IN AGV-SERVED MANUFACTURING SYSTEMS, Annals of operations research, 76, 1998, pp. 109-154
Citation: C. Sriskandarajah et al., MAINTENANCE SCHEDULING OF ROLLING STOCK USING A GENETIC ALGORITHM, The Journal of the Operational Research Society, 49(11), 1998, pp. 1130-1145
Citation: R. Logendra et C. Sriskandarajah, A MATHEMATICAL-MODELING APPROACH FOR THE PROCESS OF PART ORIENTATION IN BATCH ASSEMBLY AUTOMATION, International journal of computer integrated manufacturing, 10(5), 1997, pp. 335-345
Authors:
WANG M
SETHI S
SRISKANDARAJAH C
VANDEVELDE S
Citation: M. Wang et al., MINIMIZING MAKESPAN IN FLOWSHOPS WITH PALLET REQUIREMENTS - COMPUTATIONAL-COMPLEXITY, INFOR. Information systems and operational research, 35(4), 1997, pp. 277-285
Citation: G. Laporte et al., SOME APPLICATIONS OF THE GENERALIZED TRAVELING SALESMAN PROBLEM, The Journal of the Operational Research Society, 47(12), 1996, pp. 1461-1467
Citation: Ng. Hall et C. Sriskandarajah, A SURVEY OF MACHINE SCHEDULING PROBLEMS WITH BLOCKING AND NO-WAIT IN-PROCESS, Operations research, 44(3), 1996, pp. 510-525
Citation: R. Logendran et C. Sriskandarajah, SEQUENCING OF ROBOT ACTIVITIES AND PARTS IN 2-MACHINE ROBOTIC CELLS, International Journal of Production Research, 34(12), 1996, pp. 3447-3463
Citation: C. Sriskandarajah et E. Wagneur, ON THE COMPLEXITY OF PREEMPTIVE OPENSHOP SCHEDULING PROBLEMS, European journal of operational research, 77(3), 1994, pp. 404-414
Authors:
LOGENDRAN R
RAMAKRISHNA P
SRISKANDARAJAH C
Citation: R. Logendran et al., TABU SEARCH-BASED HEURISTICS FOR CELLULAR MANUFACTURING SYSTEMS IN THE PRESENCE OF ALTERNATIVE PROCESS PLANS, International Journal of Production Research, 32(2), 1994, pp. 273-297
Citation: E. Wagneur et C. Sriskandarajah, THE 2-MACHINE PERMUTATION FLOW-SHOP WITH STATE-DEPENDENT PROCESSING TIMES, Naval research logistics, 40(5), 1993, pp. 697-717
Citation: H. Kamoun et C. Sriskandarajah, THE COMPLEXITY OF SCHEDULING JOBS IN REPETITIVE MANUFACTURING SYSTEMS, European journal of operational research, 70(3), 1993, pp. 350-364
Citation: C. Sriskandarajah, PERFORMANCE OF SCHEDULING ALGORITHMS FOR NO-WAIT FLOWSHOPS WITH PARALLEL MACHINES, European journal of operational research, 70(3), 1993, pp. 365-378
Citation: R. Logendran et C. Sriskandarajah, 2-MACHINE GROUP SCHEDULING PROBLEM WITH BLOCKING AND ANTICIPATORY SETUPS, European journal of operational research, 69(3), 1993, pp. 467-481