Citation: Ga. Suer, MINIMIZING THE NUMBER OF TARDY JOBS IN MULTIPERIOD CELL LOADING PROBLEMS, Computers & industrial engineering, 33(3-4), 1997, pp. 721-724
Citation: Ga. Suer et I. Sanchezbera, COMMON CELL-SIZE DETERMINATION AND CELL LOADING IN LABOR-INTENSIVE MANUFACTURING CELLS, Computers & industrial engineering, 33(1-2), 1997, pp. 221-224
Citation: Aa. Cedeno et Ga. Suer, THE USE OF A SIMILARITY COEFFICIENT-BASED METHOD TO PERFORM CLUSTERING ANALYSIS TO A LARGE SET OF DATA WITH DISSIMILAR PARTS, Computers & industrial engineering, 33(1-2), 1997, pp. 225-228
Citation: Ga. Suer et al., IDENTICAL MACHINE SCHEDULING TO MINIMIZE THE NUMBER OF TARDY JOBS WHEN LOT-SPLITTING IS ALLOWED, Computers & industrial engineering, 33(1-2), 1997, pp. 277-280
Citation: Ga. Suer et Aa. Cedeno, A CONFIGURATION-BASED CLUSTERING-ALGORITHM FOR FAMILY FORMATION, Computers & industrial engineering, 31(1-2), 1996, pp. 147-150
Citation: Ga. Suer et M. Ortega, A MACHINE LEVEL BASED-SIMILARITY COEFFICIENT FOR FORMING MANUFACTURING CELLS, Computers & industrial engineering, 27(1-4), 1994, pp. 67-70
Citation: Ga. Suer et al., MINIMIZING THE NUMBER OF TARDY JOBS IN IDENTICAL MACHINE SCHEDULING, Computers & industrial engineering, 25(1-4), 1993, pp. 243-246