AAAAAA

   
Results: 1-11 |
Results: 11

Authors: SUER GA BERA IS
Citation: Ga. Suer et Is. Bera, MULTIPERIOD CELL LOADING AND CELL-SIZE DETERMINATION, Computers & industrial engineering, 35(1-2), 1998, pp. 85-88

Authors: SUER GA
Citation: Ga. Suer, MINIMIZING THE NUMBER OF TARDY JOBS IN MULTIPERIOD CELL LOADING PROBLEMS, Computers & industrial engineering, 33(3-4), 1997, pp. 721-724

Authors: SUER GA SANCHEZBERA I
Citation: Ga. Suer et I. Sanchezbera, COMMON CELL-SIZE DETERMINATION AND CELL LOADING IN LABOR-INTENSIVE MANUFACTURING CELLS, Computers & industrial engineering, 33(1-2), 1997, pp. 221-224

Authors: CEDENO AA SUER GA
Citation: Aa. Cedeno et Ga. Suer, THE USE OF A SIMILARITY COEFFICIENT-BASED METHOD TO PERFORM CLUSTERING ANALYSIS TO A LARGE SET OF DATA WITH DISSIMILAR PARTS, Computers & industrial engineering, 33(1-2), 1997, pp. 225-228

Authors: SUER GA PICO F SANTIAGO A
Citation: Ga. Suer et al., IDENTICAL MACHINE SCHEDULING TO MINIMIZE THE NUMBER OF TARDY JOBS WHEN LOT-SPLITTING IS ALLOWED, Computers & industrial engineering, 33(1-2), 1997, pp. 277-280

Authors: SUER GA CEDENO AA
Citation: Ga. Suer et Aa. Cedeno, A CONFIGURATION-BASED CLUSTERING-ALGORITHM FOR FAMILY FORMATION, Computers & industrial engineering, 31(1-2), 1996, pp. 147-150

Authors: SUER GA
Citation: Ga. Suer, OPTIMAL OPERATOR ASSIGNMENT AND CELL LOADING IN LABOR-INTENSIVE MANUFACTURING CELLS, Computers & industrial engineering, 31(1-2), 1996, pp. 155-158

Authors: SUER GA ORTEGA M
Citation: Ga. Suer et M. Ortega, A MACHINE LEVEL BASED-SIMILARITY COEFFICIENT FOR FORMING MANUFACTURING CELLS, Computers & industrial engineering, 27(1-4), 1994, pp. 67-70

Authors: SUER GA BAEZ E CZAJKIEWICZ Z
Citation: Ga. Suer et al., MINIMIZING THE NUMBER OF TARDY JOBS IN IDENTICAL MACHINE SCHEDULING, Computers & industrial engineering, 25(1-4), 1993, pp. 243-246

Authors: SUER GA SAIZ M
Citation: Ga. Suer et M. Saiz, CELL LOADING IN CELLULAR MANUFACTURING SYSTEMS, Computers & industrial engineering, 25(1-4), 1993, pp. 247-250

Authors: SUER GA LIZARDI RA
Citation: Ga. Suer et Ra. Lizardi, SCHEDULING IN AN MRP ENVIRONMENT, Computers & industrial engineering, 25(1-4), 1993, pp. 251-254
Risultati: 1-11 |