AAAAAA

   
Results: 1-12 |
Results: 12

Authors: Sloan, TW Shanthikumar, JG
Citation: Tw. Sloan et Jg. Shanthikumar, Using in-line equipment condition and yield information for maintenance scheduling and dispatching in semiconductor wafer fabs, IIE TRANS, 34(2), 2002, pp. 191-209

Authors: Righter, R Shanthikumar, JG
Citation: R. Righter et Jg. Shanthikumar, Optimal ordering of operations in a manufacturing chain, OPER RES L, 29(3), 2001, pp. 115-121

Authors: Nurani, RK Shanthikumar, JG
Citation: Rk. Nurani et Jg. Shanthikumar, Process control for items produced in lots with inter and intra lot variations, INT J IN EN, 7(1), 2000, pp. 57-66

Authors: Sloan, TW Shanthikumar, JG
Citation: Tw. Sloan et Jg. Shanthikumar, Combined production and maintenance scheduling for a multiple-product, single-machine production system, PROD OPER M, 9(4), 2000, pp. 379-399

Authors: Shanthikumar, JG Xu, SH
Citation: Jg. Shanthikumar et Sh. Xu, Strongly asymptotically optimal design and control of production and service systems, IIE TRANS, 32(9), 2000, pp. 881-890

Authors: Ross, SM Shanthikumar, JG
Citation: Sm. Ross et Jg. Shanthikumar, Pricing exotic options - Monotonicity in volatility and efficient stimulation, PROB ENG I, 14(3), 2000, pp. 317-326

Authors: Xia, CH Shanthikumar, JG Glynn, PW
Citation: Ch. Xia et al., On the asymptotic optimality of the SPT rule for the flow shop average completion time problem, OPERAT RES, 48(4), 2000, pp. 615-622

Authors: Chatterjee, A Gudmundsson, D Nurani, RK Seshadri, S Shanthikumar, JG
Citation: A. Chatterjee et al., Fabless-foundry partnership: Models and analysis of coordination issues, IEEE SEMIC, 12(1), 1999, pp. 44-52

Authors: Celikbas, M Shanthikumar, JG Swaminathan, JM
Citation: M. Celikbas et al., Coordinating production quantities and demand forecasts through penalty schemes, IIE TRANS, 31(9), 1999, pp. 851-864

Authors: Meester, LE Shanthikumar, JG
Citation: Le. Meester et Jg. Shanthikumar, Stochastic convexity on general space, MATH OPER R, 24(2), 1999, pp. 472-494

Authors: Shanthikumar, JG Zazanis, MA
Citation: Jg. Shanthikumar et Ma. Zazanis, Inequalities between event and time averages, PROB ENG I, 13(3), 1999, pp. 293-308

Authors: Swaminathan, JM Shanthikumar, JG
Citation: Jm. Swaminathan et Jg. Shanthikumar, Supplier diversification: effect of discrete demand, OPER RES L, 24(5), 1999, pp. 213-221
Risultati: 1-12 |