Citation: Tw. Sloan et Jg. Shanthikumar, Using in-line equipment condition and yield information for maintenance scheduling and dispatching in semiconductor wafer fabs, IIE TRANS, 34(2), 2002, pp. 191-209
Citation: Rk. Nurani et Jg. Shanthikumar, Process control for items produced in lots with inter and intra lot variations, INT J IN EN, 7(1), 2000, pp. 57-66
Citation: Tw. Sloan et Jg. Shanthikumar, Combined production and maintenance scheduling for a multiple-product, single-machine production system, PROD OPER M, 9(4), 2000, pp. 379-399
Citation: Jg. Shanthikumar et Sh. Xu, Strongly asymptotically optimal design and control of production and service systems, IIE TRANS, 32(9), 2000, pp. 881-890
Citation: Sm. Ross et Jg. Shanthikumar, Pricing exotic options - Monotonicity in volatility and efficient stimulation, PROB ENG I, 14(3), 2000, pp. 317-326
Citation: Ch. Xia et al., On the asymptotic optimality of the SPT rule for the flow shop average completion time problem, OPERAT RES, 48(4), 2000, pp. 615-622