AAAAAA

   
Results: 1-11 |
Results: 11

Authors: SELIM HM ASKIN RG VAKHARIA AJ
Citation: Hm. Selim et al., CELL-FORMATION IN GROUP TECHNOLOGY - REVIEW, EVALUATION AND DIRECTIONS FOR FUTURE-RESEARCH, Computers & industrial engineering, 34(1), 1998, pp. 3-20

Authors: SCHALLER JE ERENGUC SS VAKHARIA AJ
Citation: Je. Schaller et al., A METHODOLOGY FOR INTEGRATING CELL-FORMATION AND PRODUCTION PLANNING IN CELLULAR MANUFACTURING, Annals of operations research, 77, 1998, pp. 1-21

Authors: VAKHARIA AJ CATAY B
Citation: Aj. Vakharia et B. Catay, 2-MACHINE OPEN-SHOP SCHEDULING WITH MACHINE-DEPENDENT PROCESSING TIMES, Discrete applied mathematics, 73(3), 1997, pp. 283-288

Authors: ASKIN RG SELIM HM VAKHARIA AJ
Citation: Rg. Askin et al., A METHODOLOGY FOR DESIGNING FLEXIBLE CELLULAR MANUFACTURING SYSTEMS, IIE transactions, 29(7), 1997, pp. 599-610

Authors: VAKHARIA AJ CHANG YL
Citation: Aj. Vakharia et Yl. Chang, CELL-FORMATION IN GROUP TECHNOLOGY - A COMBINATORIAL SEARCH APPROACH, International Journal of Production Research, 35(7), 1997, pp. 2025-2043

Authors: MOEENI F SANCHEZ SM VAKHARIA AJ
Citation: F. Moeeni et al., A ROBUST DESIGN METHODOLOGY FOR KANBAN SYSTEM-DESIGN, International Journal of Production Research, 35(10), 1997, pp. 2821-2838

Authors: AGNETIS A DROR M VAKHARIA AJ ROSSI F
Citation: A. Agnetis et al., TOOL HANDLING AND SCHEDULING IN A 2-MACHINE FLEXIBLE MANUFACTURING CELL, IIE transactions, 28(5), 1996, pp. 425-437

Authors: ASKIN RG DROR M VAKHARIA AJ
Citation: Rg. Askin et al., PRINTED-CIRCUIT BOARD FAMILY GROUPING AND COMPONENT ALLOCATION FOR A MULTIMACHINE, OPEN-SHOP ASSEMBLY CELL, Naval research logistics, 41(5), 1994, pp. 587-608

Authors: WEMMERLOV U VAKHARIA AJ
Citation: U. Wemmerlov et Aj. Vakharia, ON THE IMPACT OF FAMILY SCHEDULING PROCEDURES, IIE transactions, 25(4), 1993, pp. 102-104

Authors: SKORINKAPOV J VAKHARIA AJ
Citation: J. Skorinkapov et Aj. Vakharia, SCHEDULING A FLOW-LINE MANUFACTURING CELL - A TABU SEARCH APPROACH, International Journal of Production Research, 31(7), 1993, pp. 1721-1734

Authors: VAKHARIA AJ KAKU BK
Citation: Aj. Vakharia et Bk. Kaku, REDESIGNING A CELLULAR MANUFACTURING SYSTEM TO HANDLE LONG-TERM DEMAND CHANGES - A METHODOLOGY AND INVESTIGATION, Decision sciences, 24(5), 1993, pp. 909-930
Risultati: 1-11 |