AAAAAA

   
Results: 1-3 |
Results: 3

Authors: Jozefowska, J Mika, M Rozycki, R Waligora, G Weglarz, J
Citation: J. Jozefowska et al., Simulated annealing for multi-mode resource-constrained project scheduling, ANN OPER R, 102, 2001, pp. 137-155

Authors: Jozefowska, J Mika, M Rozycki, R Waligora, G Weglarz, J
Citation: J. Jozefowska et al., Solving the discrete-continuous project scheduling problem via its discretization, MATH M O R, 52(3), 2000, pp. 489-499

Authors: Jozefowska, J Mika, M Rozycki, R Waligora, G Weglarz, J
Citation: J. Jozefowska et al., Discrete-continuous scheduling to minimize the makespan for power processing rates of jobs, DISCR APP M, 94(1-3), 1999, pp. 263-285
Risultati: 1-3 |