AAAAAA

   
Results: 1-4 |
Results: 4

Authors: XING LM FLEMING KN LOH WT
Citation: Lm. Xing et al., COMPARISON OF MARKOV MODEL AND FAULT-TREE APPROACH IN DETERMINING INITIATING EVENT FREQUENCY FOR SYSTEMS WITH 2 TRAIN CONFIGURATIONS, Reliability engineering & systems safety, 53(1), 1996, pp. 17-29

Authors: XING LM OKRENT D
Citation: Lm. Xing et D. Okrent, THE USE OF NEURAL NETWORKS AND A PROTOTYPE EXPERT-SYSTEM IN BWR ATWS ACCIDENTS DIAGNOSIS, Reliability engineering & systems safety, 44(3), 1994, pp. 361-372

Authors: YU DH XING LM KASTENBERG WE OKRENT D
Citation: Dh. Yu et al., EVALUATION OF A SEVERE ACCIDENT MANAGEMENT STRATEGY FOR BOILING WATER-REACTORS - DRYWELL FLOODING, Nuclear technology, 106(2), 1994, pp. 139-154

Authors: OKRENT D XING LM
Citation: D. Okrent et Lm. Xing, FUTURE RISK FROM A HYPOTHESIZED RCRA SITE DISPOSING OF CARCINOGENIC METALS SHOULD A LOSS OF SOCIETAL MEMORY OCCUR, Journal of hazardous materials, 34(3), 1993, pp. 363-384
Risultati: 1-4 |