R. Henrion et al., TURN KEY STEELPLANT FOR STAHLWERK-THURINGEN (ARBED GROUP) ERECTED BY VAI WITHIN 16 MONTHS, Revue de métallurgie, 94(10), 1997, pp. 1185-1193
In an extremely short time, a new steel plant was designed and built f
or the supply of beans blanks to the section mill of Stahlwerk Thuring
en, Modern technologies are used, in particular for the DC electric ar
e furnace, and a high degree of automation has been achieved from the
scrap yard to the shipment of the finished product, Thanks to a precis
e coordination of the steelmaking and the rolling mill operation, the
rate of hot charging has been maximized.