TURN KEY STEELPLANT FOR STAHLWERK-THURINGEN (ARBED GROUP) ERECTED BY VAI WITHIN 16 MONTHS

Citation
R. Henrion et al., TURN KEY STEELPLANT FOR STAHLWERK-THURINGEN (ARBED GROUP) ERECTED BY VAI WITHIN 16 MONTHS, Revue de métallurgie, 94(10), 1997, pp. 1185-1193
Citations number
2
Categorie Soggetti
Metallurgy & Metallurigical Engineering
Journal title
Revue de métallurgie
ISSN journal
00351563 → ACNP
Volume
94
Issue
10
Year of publication
1997
Pages
1185 - 1193
Database
ISI
SICI code
Abstract
In an extremely short time, a new steel plant was designed and built f or the supply of beans blanks to the section mill of Stahlwerk Thuring en, Modern technologies are used, in particular for the DC electric ar e furnace, and a high degree of automation has been achieved from the scrap yard to the shipment of the finished product, Thanks to a precis e coordination of the steelmaking and the rolling mill operation, the rate of hot charging has been maximized.