This paper presents a very effective method for direct load control (D
LC) dispatch with the objective of minimizing system operational costs
. In the paper, the coordination between DLC dispatch and unit commitm
ent is discussed, and the significant potential benefit accrued from u
sing DLC capacity as a part of system spinning reserve is illustrated.
This paper also presents an extension of the proposed method to inclu
de consideration of capital cost saving.