During the peak period, the precasting plant produced 1200 m3 of concr
ete per day. This Paper begins with a description of the installation,
giving an idea of its extent, then looks in detail at its operations
and indicates the performance levels achieved. The reinforcement shop
and casting shop are described. The stringent quality control procedur
es, which involved certain difficulties in production, handling and st
orage phases are explained.