Studies of the full fuel cycle costs of power generation can be comple
x and time-consuming. Uncertainty is often neglected, as attention is
directed at other aspects of the problem. This paper describes some te
chniques for handling uncertainty, including sensitivity and probabili
stic analysis. Results show the uncertainty in parts of the external c
osts for a coal-fired power station, and the main influences are explo
red.