This paper presents different strategies for preventing oil from fouli
ng the walls of core-annular flow pipelines and also for restart from
an unexpected pipeline shut-down. The most promising of these strategi
es is to use cement-lined pipes. Experiments presented here show that
hydrated cement-lined pipes are highly oleophobic and therefore resist
fouling for long term. A pilot scale cement-lined core-annular flow p
ipeline using No. 6 fuel oil never fouled in over 1000 h of operation.
Repeated and determined attempts to soil properly hydrated cement-lin
ed pipes with heavy Venezuelan crudes always failed.