Ss. Chakravorty et Jb. Atwater, DO JIT LINES PERFORM BETTER THAN TRADITIONALLY BALANCED LINES, International journal of operations & production management, 15(2), 1995, pp. 77
Over the past decade, JIT approach for designing and operating lines h
as evolved to compete on time dimensions. Traditionally, the lines des
igned and operated using line balancing approach are considered optima
l. Uses simulation methodology to compare each of these approaches und
er various levels of system variability and total inventory in the sys
tem. Shows that when system variability is low, the JIT line produces
lower cycle time at almost all levels of total inventory in the system
. However, when system variability is high the balanced line yields lo
wer cycle time, especially at lower levels of inventory in the system.