DRYOUT OF WATER FILM ON A HEATED TUBE SURFACE CAUSED BY AN OBSTRUCTION IN A BOILING 2-PHASE VERTICAL UPWARD FLOW

Citation
T. Fukano et al., DRYOUT OF WATER FILM ON A HEATED TUBE SURFACE CAUSED BY AN OBSTRUCTION IN A BOILING 2-PHASE VERTICAL UPWARD FLOW, Chemical engineering communications, 141, 1996, pp. 191-206
Citations number
5
Categorie Soggetti
Engineering, Chemical
ISSN journal
00986445
Volume
141
Year of publication
1996
Pages
191 - 206
Database
ISI
SICI code
0098-6445(1996)141:<191:DOWFOA>2.0.ZU;2-E
Abstract
Due to the increasing consumption of energy and the green house effect caused by CO2 nuclear power stations have been playing more important role than ever in the electric power generation. And both the economy and the safety of the nuclear power station are strongly demanded. On e of the restriction in the thermal design of the safe and economic nu clear reactor, especially in BWR is pointed out to be the heat removal from the fuel rods near the rods supporting spacer. The purpose of th e present paper is to investigate the mechanism of the water film brea kdown which results in the burnout of heating tube near the spacer und er various flow pattern. The experimental results show that the film b reakdown occurs near the leading edge, i.e., just below the spacer, as well as the inside of the down parr of the gap between the heating tu be and the spacer.